Skip to main content

Netherlands traffic congestion increasing

The Netherlands is seeing a massive increase in traffic congestion on its road network. Traffic volumes for the first six months of 2018 were 20% higher than for the same period in the previous year. The data was collated by the Netherlands-based transport body ANWB. This also reveals that the most severe congestion problems occurred on the A4 highway between Amsterdam and Rotterdam, the A20 highway between the Hoek van Holland and Gouda and the A27 highway between Utrecht and Breda.
July 5, 2018 Read time: 1 min

The Netherlands is seeing a massive increase in traffic congestion on its road network. Traffic volumes for the first six months of 2018 were 20% higher than for the same period in the previous year. The data was collated by the Netherlands-based transport body 5181 ANWB. This also reveals that the most severe congestion problems occurred on the A4 highway between Amsterdam and Rotterdam, the A20 highway between the Hoek van Holland and Gouda and the A27 highway between Utrecht and Breda.

For more information on companies in this article

Related Content

  • East Africa’s dream of a ‘Silk Road’ in sight
    October 22, 2021
    East Africa’s dream of a ‘Silk Road’ route to boost trade and transport is now in sight
  • EAPA figures show increase in RAP use
    February 24, 2020
    Official European Asphalt Paving Association (EAPA) figures show recycled asphalt pavement (RAP) use increasing.
  • Deutz sees new orders rise 43% in Q1 this year
    April 17, 2018
    German engine manufacturer Deutz saw new orders rise in the first quarter 2018 by nearly 43% per cent year-on-year to almost €575 million. The figure for the corresponding period in 2017 was €403 million, while in the fourth quarter of 2017 it was nearly €383 million. The company said that the significant rise in new orders was partly due to very favourable business conditions as well as to changed customer procurement behaviour. In the light of the strong demand and the introduction of emissions standard
  • Cifa gets pumped over final work on Milan bypass
    May 14, 2015
    Truck-mounted concrete pumps from the manufacturer Cifa have been working around the clock at one of Italy’s most prestigious road infrastructure projects, the Milan Outer Bypass. The toll motorway project, known by the TEEM acronym from the Italian name Tangenziale Est Esterna di Milano, involves 32km of new carriageway consisting of three lanes in each direction in addition to an emergency lane. The route winds through agricultural land and connects the A4 highway (Milano-Venezia) in the north to the A