Skip to main content

Metrostav Norge's Faroe tunnel on target

Metrostav Norge won the contract to connect the villages of Fámjin and Ørðavík on Suðuroy Island, part of the Faroes, in 2022.
By David Arminas December 18, 2023 Read time: 2 mins
Every tunnel helps: around 80% of the Faroes population is connected by tunnels (image © Niels Melander/Dreamstime)

Work continues by the Czech construction firm Metrostav on a 1.2km tunnel in the Danish Faroe Islands.

The Metrostav Group, through its subsidiary Metrostav Norge, won the contract to connect the villages of Fámjin and Ørðavík in the autumn of 2022. Less than 90 people live in the area which is on Suðuroy Island, one of  in the Faroes island group.

The tunnel is being built using the Norwegian drill-and-blast tunnelling method. Around 220 of the company's employees are on site. According to the company, the deal is worth around €8.8 million. The tunnel is being excavated from a portal located above the village of Ørðavík. Included in the work of Metrostav Norge is grouting and the installation of around 9,000m² water and frost insulation. Around 4,275m³ of shotcrete will have been used upon completion.

The main client is Landsverk, the Faroes highways agency responsible for building, operating and maintain the country’s highway infrastructure.

The Faroe island group in the North Sea is around 320km north of the UK and about halfway between Norway and Iceland. The country is an autonomous  self-governing region of Denmark and legislates and governs independently in a wide range of areas. The country is rugged and has a subpolar oceanic climate - windy, wet, cloudy and cool. Temperatures are moderated by the Gulf Stream, averaging above freezing throughout the year.

Road tunnels – there are no rail services in the island group – are an important part of the transport infrastructure. Around 80% of the population is connected by tunnels through the mountains and between the islands, bridges and causeways that link together the three largest islands and three other islands to the northeast. While the other two large islands to the south, Sandoy and Suðuroy, are connected to the main area with ferries, the small islands Koltur and Stóra Dímun have no ferry connection, only a helicopter service

For more information on companies in this article

Related Content

  • Bridging Brunei with a PmB structural waterproofing system
    November 29, 2019
    Pitchmastic PmB is wrapping up its bridge-deck waterproofing work on South East Asia’s longest over-sea crossing, the 30km Temburong Bridge in Brunei.
  • China looks to the future with major highway plans
    February 15, 2012
    China is still moving ahead with plans that will give it the world's biggest highway system. Patrick Smith reports. As China's economy grows even more, keeping the country on the move has become a priority for the government. While the country has made great strides over the past decade in improving its infrastructure, the number of vehicles has also increased rapidly, and in some instances restrictions have been placed on them.
  • Ethiopia races on with projects
    June 13, 2012
    Ethiopia is pursuing a 10-year $2.4 billion development plan, part of which are ambitious road developments. Shem Oirere reports Ethiopia is hastening its pace towards accessing a share of the East Africa commodity market and opening itself up for foreign investment through the implementation of an ambitious road development strategy, the Road Sector Development Programme (RSDP). The landlocked nation has convinced a number of international lenders of the viability of RSDP, with some of them now loosening
  • Excavation offering
    July 16, 2012
    There are various ways of building a tunnel, and for excavation jobs many contractors prefer to use versions of standard machines that have instead been converted to suit the confines of tunnelling applications. Some contractors opt to adapt their own units and with ventilation being an issue in underground work, engine emissions are a key focus when adapting machines. Exhaust filters and other after treatment solutions are usually required and there are an array of off-the-shelf packages available as well