Skip to main content

M100 wireless detector milestone

Clearview Traffic Group has announced the 150th installation of the Golden River M100 wireless vehicle detection system within the UK. This milestone also marks an installed base of over 1,500 M100 sensors and 300 M110 Access Points in the two years since its launch.
March 19, 2012 Read time: 2 mins

707 Clearview Traffic Group has announced the 150th installation of the 3937 Golden River M100 wireless vehicle detection system within the UK. This milestone also marks an installed base of over 1,500 M100 sensors and 300 M110 Access Points in the two years since its launch. As the company points out, together these elements of the Golden River solution challenge the traditional model of inductive loop based traffic signal control and deliver significant cost benefits to road authorities by reducing both the initial capital outlay and the total cost of ownership throughout the lifetime of the solution.

“Five years ago, it would have been practically unthinkable to depose loop-base technology, so to reach this landmark is testament to the hard work of our team and the work they have done to deliver lasting trusting relationships with our customers,” says Nick Lanigan, managing director of Clearview Traffic Group.

The M100 wireless magnetometer range together with the M120 contact closure card is currently the only fully type approved wireless magnetometer vehicle detection solution approved to the UK 2309 Highways Agency standard TR2512A for below ground vehicle detectors covering traffic signal control applications.

Looking to the future, Clearview Traffic says it will continue to grow the traffic signals market whilst actively working to develop additional solutions for magnetometer-based detection technology, including motorway incident detection and automatic signalling (MIDAS), ramp metering and bicycle counting.

For more information on companies in this article

Related Content

  • IRF Presents 2017 Road Safety Award to Korea
    August 30, 2017
    The International Road Federation has introduced a landmark Global Credential Programme for Road Safety Audit Team Leaders, recognising the essential role of Road Safety Audits to drive change in safe road design practices. Preventive risk assessment measures, such as a road safety audit or inspection, carried out on new and existing roads offer a well-charted and cost-effective pathway to reducing road traffic injury risk. Yet, those countries with the fastest growth in motorisation and road construction
  • Performance boost for Doosan ADTs
    September 30, 2013
    Doosan is offering increased performance for its DA30 and DA40 ADTs, boosting productivity in earthmoving as well as extraction operations. New features include a levelling meter developed to meet increased safety requirements in the quarry industry will help to raise the safety bar even further. The system uses rotation sensors installed on the front and body of the truck which provide a graphical readout on the control panel. This tells the driver whether or not it is safe to drive the truck forward and
  • Bridge formwork solutions complete big bridge picture
    July 2, 2014
    Advanced bridge formwork solutions are allowing contractors to complete vital major highway infrastructure projects covering Norway, Sweden, Estonia and Poland. Guy Woodford reports Building the Labbdalen bridges in Norway is a key feature of the E6 highway improvement programme. Main project contractor HÆHRE tasked RMD Kwikform and Teknikk with supplying a complete formwork and shoring solution that could tackle the challenging Norwegian terrain, whilst preserving the environment. Situated two hours
  • Brisbane’s new airport link is an engineering success
    April 12, 2013
    Financial troubles for Brisbane's new Airport Link overshadow its construction success – Adrian Greeman writes. Political argument and legal dispute is likely to rage for some time yet over the bankruptcy of Australian road operator BrisConnect, which went into receivership this February with A$3 billion in debt. Toll paying users for its new Airport Link have been less than half the predicted numbers since it opened in July last summer. But if its nancial engineering is being questioned, the same is not t