Skip to main content

Hungary's new highways

Work will start in the second half of 2011 on a new stretch of Hungary's M3 highway between Vasarosnameny and the number 49 highway.
March 1, 2012 Read time: 1 min
Work will start in the second half of 2011 on a new stretch of Hungary's M3 highway between Vasarosnameny and the number 49 highway. The 12km construction project will be completed by the end of 2012. Meanwhile, construction design work for the 28km section of the M49 highway between Okoritofulpos and Or will be completed by the end of 2011. The new M49 section is expected to open by 2014. The project includes the construction of three rail overpasses, four canal overpasses and five junctions. Plans are also being made for a 33km long stretch of the M3 highway between Or and Nyiregyhaza. This last project will cost €120.5 million and should be completed by the end of 2012.

Related Content

  • VolkerFitzpatrick to upgrade M3 junction
    December 20, 2022
    VolkerFitzpatrick will also construct three bridges, rearrange the main junction 9 roundabout and reuse the existing sub-base from the project near London.
  • New projects are planned to improve road links in and around Moscow
    March 11, 2015
    A series of separate works will help improve traffic flow in and around Russia’s capital, Moscow. Construction work has commenced on three tunnels as well as an overpass, with this activity forming part of the planned improvement of the Kaluzhskoe Highway. The work is being carried out by contractor Arks. The work involves widening the highway so that it will feature, and in some places five, lanes in either direction. The contractor is also constructing emergency lanes, 28 km of storm drains and improving
  • Mexico’s new highway link
    May 18, 2018
    The first section of the Cardel-Poza Rica highway has now been opened to traffic. The highway is in Mexico’s Veracruz State and the 30-year concession is being handled jointly by Mota-Engil and PRODI, which was awarded the tender by Mexico’s Secretariat of Communications and Transport (SCT) in mid-2014 with a bid of US$266.5 million. This first stretch of the highway that is now in use is the 55km section that runs from Nautla to Gutierrez Zamora. This stretch features 11 bridges, 11 underpasses and five
  • Peru’s Oyón -Ambo Highway presents challenges
    August 30, 2022
    Peru’s Oyón-Ambo highway project represents a landmark in construction for the country, while facing significant technical challenges – Paula Chapple, editor of Carreteras Pan-Americana (CPA), writes