Skip to main content

Hungary's new highways

Work will start in the second half of 2011 on a new stretch of Hungary's M3 highway between Vasarosnameny and the number 49 highway.
March 1, 2012 Read time: 1 min
Work will start in the second half of 2011 on a new stretch of Hungary's M3 highway between Vasarosnameny and the number 49 highway. The 12km construction project will be completed by the end of 2012. Meanwhile, construction design work for the 28km section of the M49 highway between Okoritofulpos and Or will be completed by the end of 2011. The new M49 section is expected to open by 2014. The project includes the construction of three rail overpasses, four canal overpasses and five junctions. Plans are also being made for a 33km long stretch of the M3 highway between Or and Nyiregyhaza. This last project will cost €120.5 million and should be completed by the end of 2012.

Related Content

  • Progress for new highway project in Colombia
    June 5, 2014
    In Colombia the firm Estructura Plural Mario Alberto Huertas-Constructora MECO has been awarded the Girardot-Puerto Salgar 4G highway concession. The US$674 million concession was awarded following a short delay due to legal complexities by Colombia's national infrastructure agency ANI, reports Business News Americas. The 214km Girardot-Puerto Salgar highway is in central Colombia and the concession package includes the construction of 190km of the route, of which 22km will be totally new. A 135km stretch w
  • Astaldi wins Polish S7 contract between Naprawa and Skomielna Biala
    March 3, 2016
    Astaldi, a global construction company based in Rome, has won a contract worth nearly €222 million for construction of Poland’s S7 dual carriageway between Naprawa and Skomielna Biala. The contract, awarded by the Polish General Directorate for National Roads and Motorways (GDDKiA), includes construction of a 2km tunnel under the Lubon Maly massif, 38 bridges and viaducts and three motorway services. There will also be 25km of access roads and two junctions. The north-south S7, when completed, will ru
  • New highway tender for Chile’s capital
    July 26, 2013
    The tender process is commencing for the Américo Vespucio Oriente expressway (AVO) in Chilean capital Santiago. The US$940 million tender is due to be awarded in February 2014. The 9km highway link will connect El Salto with Príncipe de Gales Avenue and will feature three lanes running in either direction, with a design speed of 80-100km/h. An underground section of this urban highway looks likely to be constructed using the New Austrian Tunnelling Method (NATM) while it may also include a section in an ope
  • Polish projects provide transport plan
    September 19, 2014
    Poland is planning to enter seven transport projects to the Connecting Europe Programme, with these having a combined value close to €2.86 billion. Among the planned projects are the S61 express road between the Lithuanian border and Augustow. Meanwhile STRABAG and Budimex have formed a consortium that will construct a 41km stretch of the A4 highway in Poland. The section of the route runs from Rzeszów to Jarosław, in south-eastern Poland. The project is expected to take 14 months to complete and the contra