Skip to main content

Colombia: more money for Toyo Tunnel Project

The Toyo Tunnel Project – the Guillermo Gaviria Echeverri Tunnel Project - covers 18.3km including new roads and is under construction by Consorcio Antioquia al Mar.
By David Arminas April 4, 2024 Read time: 2 mins
The 9.7km-long Toyo Tunnel is the longest in Colombia and running deepest at 900m (image courtesy Gobernacion de Antioquia/Government of Antioquia)

The Colombian government has committed nearly US$144 million to complete the Toyo Tunnel Project in the northwest department of Antioquia.

With a population of around six million, Antioquia is one of the 32 national departments and is located in the central northwest part of Colombia with a narrow section that borders the Caribbean Sea. Most of its territory is mountainous much of which is part of the Andes mountain range.

The Toyo Tunnel Project – also called the Guillermo Gaviria Echeverri Tunnel Project- covers 18.3km connecting the municipalities of Cañasgordas and Giraldo. It includes bridges and the 9.7km-long Toyo Tunnel, the longest in Colombia and running deepest at 900m. It is also is one of many in Colombia’s “fourth-generation (4G) highway network” projects to improve connections nationally.

The Consorcio Antioquia al Mar, a consortium, was awarded the 10-year construction contract in 2015, according to BN Americas, a business intelligence platform that provides information and data solutions to project owners, contractors, suppliers and financial services firms. Consorcio Antioquia al Mar consists of infrastructure contractors Colombiana de Infraestructuras, Carlos Alberto Solarte and CASS Constructores as well as tunnelling civil engineering specialist Estyma Estudios y Manejos

BN Americas  also notes that the agreement between the companies gives Colombiana de Infraestructuras, a subsidiary of Spanish company FCC, 40% ownership and a 20% ownership each for Carlos Alberto Solarte, Estyma Estudios y Manejos and CASS Constructores.

Engineering consultancy WSP worked on final studies and designs in Phase III for Section No. 1 for the consortium. Its work included a transportation study, a soil study for the design of bridge foundations and other retaining structures, a slope stability and stabilisation study, geotechnical study and pavement design, hydraulics analysis and tunnel study and designs.

The consortium also worked with Swedish equipment maker Epiroc for drilling and ventilation strategies. Epiroc's Boomer XE3C and Boomer E2C jumbos with ABC Total Navigation systems have excavated around 1.4 million cubic meters of soil.

For more information on companies in this article

Related Content

  • Plans for new Saudi Arabia-Bahrain causeway project
    November 4, 2019
    A contract for consultancy work on the Saudi Arabia to Bahrain causeway project has been awarded.
  • Tunnels and bridges, improving Argentina's major road link
    April 24, 2012
    A road improvement plus tunnel and bridge building contract in an area once inhabited by dinosaurs in northern Argentina, is a small but key part of an ambitious project to complete a road that will eventually link the Atlantic and Pacific coasts of Latin America - Adriana Potts reports. Remote, rough and spectacular are words that come to mind when describing the mountains of Ischigualasto in Argentina's northern province of San Juan This is the only place in the world where an undisturbed sequence of rock
  • Tunnels and bridges, improving Argentina's major road link
    May 2, 2012
    A road improvement plus tunnel and bridge building contract in an area once inhabited by dinosaurs in northern Argentina, is a small but key part of an ambitious project to complete a road that will eventually link the Atlantic and Pacific coasts of Latin America - Adriana Potts reports. Remote, rough and spectacular are words that come to mind when describing the mountains of Ischigualasto in Argentina's northern province of San Juan This is the only place in the world where an undisturbed sequence of rock
  • Turkish win for Romanian Sibiu-Pitesti section
    March 10, 2022
    Mapa Insaat and Cengiz Insaat Sanayi will build the the 31km between Boita and Cornetu.