Skip to main content

Bids in for Bucharest Ring Motorway segment

The 101km-long motorway - also called the Bucharest Belt Motorway and the A0 Motorway -will be an outer ring highway to the existing inner Bucharest Ring Road around the Romanian capital city.
By David Arminas April 3, 2024 Read time: 2 mins
Congestion will be eased on Bucharest’s existing ininer Ring Road when the outer Ring Motorway around Romania’s capital city is finished (© LCVA/Dreamstime)

Bids have been submitted for resumption of work on the Cernica Passage and widening to four lanes of 11km of the Bucharest Ring Motorway.

The bids have come from mainly Romanian contractors but include some from Bulgaria and one from both Spain and Ukraine. Th contract value is estimated to be around €92.2 million.

The group headed by the Romanian company MARISTAR COM includes the Bulgarian companies of HYDROSTROY and PATSTROY VDH.

CONI, from Romania, leads a group that includes GOTT STASSE and PERFECT CONSULT EUROPE, also from Romania, and INFRA EXPERT from Bulgaria.

PRECON TRANSILVANIA heads up the all Romanian group consisting of SELINA and IBB-HIB ROMANIA.

ROMAIR CONSULTING leads the group containing  OYL COMPANY HOLDING, OPR ASFALT and, from Spain, OBRAS PUBLICAS Y REGADIOS.

Finally, CONCELEX is working with X-WAY INFRASTRUCTURE and BOG’ART – all from Romania - as well as AUTOMAGISTRAL PIVDEN, based in Odessa, Ukraine.

The 101km-long Bucharest Ring Motorway - also called the Bucharest Belt Motorway and the A0 Motorway - is intended to be an outer ring highway to the existing inner Bucharest Ring Road. When finished, it will A1, A2 and A3 motorways.  

Last November, the first segment of the section of the ring motorway opened - between the A3 motorway and national road DN1. In December the only section to be completed on the southern section opened to traffic - between DN5 and DN6.
 

Related Content

  • Work to start on Fehmarn Belt link to start in autumn
    April 4, 2019
    Construction of the Fehmarn Belt Fixed Link between Denmark and Germany should start this autumn for completion in 2028, according to the Danish government. Danish company Femern, which is responsible for the construction of the link, will begin negotiations with two contractor consortiums for the first of the project’s works which will start on the Danish side. A tunnel element fabrication yard and a works harbour must be built in Rødbyhavn, as well as a tunnel portal on Lolland. An autumn start wou
  • Romania sets aside €1.42 billion for local roads
    July 23, 2021
    Prime minister Florin Cîţu has had discussions with European Commission President Ursula von der Leyen to fund the country's proposed National Recovery and Resilience Plan, NRRP.
  • Bentley Systems awards finalists
    September 22, 2022
    The finalists have been announced for the Bentley Systems awards.
  • Serbia seals the deal for start of Belgrade Corridor 11 ring-road
    July 21, 2016
    Serbian vice president Zorana Mihajlovic has held talks with Li Manchang, China's Ambassador to Serbia in Serbia, for continuation of works on Belgrade’s ring road. According to the political magazine B92, Mihajlovic also signed a memorandum of understanding with Azvirt, the company from Azerbaijan, and China's Sinohidro. Discussions included continuation of work on the Surcin-Obrenovac part of the Corridor 11 motorway. A commercial deal for the project has already been signed with the China Communica