Skip to main content

Bids in for Bucharest Ring Motorway segment

The 101km-long motorway - also called the Bucharest Belt Motorway and the A0 Motorway -will be an outer ring highway to the existing inner Bucharest Ring Road around the Romanian capital city.
By David Arminas April 3, 2024 Read time: 2 mins
Congestion will be eased on Bucharest’s existing ininer Ring Road when the outer Ring Motorway around Romania’s capital city is finished (© LCVA/Dreamstime)

Bids have been submitted for resumption of work on the Cernica Passage and widening to four lanes of 11km of the Bucharest Ring Motorway.

The bids have come from mainly Romanian contractors but include some from Bulgaria and one from both Spain and Ukraine. Th contract value is estimated to be around €92.2 million.

The group headed by the Romanian company MARISTAR COM includes the Bulgarian companies of HYDROSTROY and PATSTROY VDH.

CONI, from Romania, leads a group that includes GOTT STASSE and PERFECT CONSULT EUROPE, also from Romania, and INFRA EXPERT from Bulgaria.

PRECON TRANSILVANIA heads up the all Romanian group consisting of SELINA and IBB-HIB ROMANIA.

ROMAIR CONSULTING leads the group containing  OYL COMPANY HOLDING, OPR ASFALT and, from Spain, OBRAS PUBLICAS Y REGADIOS.

Finally, CONCELEX is working with X-WAY INFRASTRUCTURE and BOG’ART – all from Romania - as well as AUTOMAGISTRAL PIVDEN, based in Odessa, Ukraine.

The 101km-long Bucharest Ring Motorway - also called the Bucharest Belt Motorway and the A0 Motorway - is intended to be an outer ring highway to the existing inner Bucharest Ring Road. When finished, it will A1, A2 and A3 motorways.  

Last November, the first segment of the section of the ring motorway opened - between the A3 motorway and national road DN1. In December the only section to be completed on the southern section opened to traffic - between DN5 and DN6.
 

Related Content

  • Second Tees Valley Viaduct proposed at Middlesbrough
    March 19, 2019
    Proposals for a second crossing over the Tees River in northern England have gone out to public consultation, according to media reports. The Tees Valley Combined Authority, the local authority, said there are two options to take the A19 trunk road over the River Tees at the city of Middlesbrough. One plan, costing between €235-292 million, would be for a bridge parallel to the existing one where each bridge would traffic in only one directions. The other option is for a four-lane €350 million brid
  • Chinese expressway expansion works
    April 11, 2023
    Chinese expressway expansion works are underway.
  • Ayesa secures contract on Panama Canal bridge project
    November 25, 2019
    Spanish engineering firm Ayesa has been awarded a US$4.7 million contract to be the independent engineer for reviewing construction of the fourth Panama canal bridge.
  • Strabag wins German A3 Autobahn contract
    July 24, 2015
    Austrian contract STRABAG has won the tender process to widen the A3 Autobahn in southern Germany. The contract will see the firm widening the A3 to six lanes in a deal worth €90 million. The A3 connects the cities of Frankfurt and Nuremburg. STRABAG has been awarded the EO 287 contract to widen a 5.7km section of the road using asphalt construction methods in the state of Bavaria. It has also won the EO 259 contract to widen an 8.5km section of road using asphalt construction methods in the state of in Bad