Skip to main content

Advanced Israeli tolled lane opens

An innovative reserved toll lane concept is helping improve traffic flow in Israeli city Tel Aviv.
March 5, 2012 Read time: 2 mins
An innovative reserved toll lane concept is helping improve traffic flow in Israeli city Tel Aviv. The new toll lane on highway No1 is using advanced tolling technology from 1134 Siemens.

The aim of this link is to cut congestion, keep traffic flowing, reduce CO2 emissions and also lower fuel consumption.

The cost of the toll varies on factors such as the level of congestion on the free to use highway sections and the time of day. "This is a worldwide unique project and a big success for us in one of the most important markets in the Middle East," explained Jörg Schneppendahl, head of Complete Transportation at 2768 Siemens Mobility. "The flexible adjustment of toll parameters has a positive effect on the traffic management. It promotes intermodal mobility and above all the use of public transportation. This means less congestion, less exhaust emissions and cleaner air." The users of the tolled lane are detected by video-based license plate recognition systems and the dynamic toll is based on current traffic demand in the approach area. The toll is charged to the minute, with the exact amount being indicated on variable message signs.

The tolled lane was built by the Israeli construction company Shapir Civil & Marine Engineering, which will operate the reserved lane for the next 27 years. The company signed a franchise agreement with the Israeli Government. The Israeli company RS Industries/Orad Group was responsible for the traffic control and toll calculation system.

Siemens Mobility supplied the complete traffic management system, which includes the hardware and software for vehicle license plate recognition, traffic data acquisition and the control of the dynamic message signs. The heart of the system is the Siemens-developed algorithm, which analyses the traffic situation and calculates the toll fee.

For more information on companies in this article

Related Content

  • Early bird deadline close for ASECAP Days
    March 21, 2025
    Check out the event before April 2 and take advantage of the early bird registration fee for the 52nd ASECAP Days to be held at the NH Collection Madrid Eurobuilding hotel in the Spanish capital Madrid.
  • Fast-track Biloxi Bay bridge
    July 18, 2012
    Construction of a bridge destroyed in a hurricane was completed early, and with some added aesthetic benefits Hurricane Katrina, one of the deadliest and costliest natural disasters in US history, made landfall on 29 August, 2005, devastating the Gulf Coast. The US 90 Bridge over Biloxi Bay (connecting the communities of Biloxi and Ocean Springs, Mississippi) was one of many major highway and railroad bridges knocked out of service due to extensive storm damage. The eye of the storm passed 96km west of Bilo
  • Caterpillar smoothens Colombian airport
    August 21, 2013
    Cartagena, Colombia’s coastal city attracts large numbers of visitors, generating heavy traffic through the Rafael Nuñez International Airport. However the surface of the runway had suffered from heavy wear, r esulting in bumpy landings and this was in need of repair. In addition, engineers wanted to create a graded, ramped approach to aid with both take-offs and landings. However, the volume of air traffic using the airport meant that construction work had to take place in a tight timeframe, between mi
  • A 'roller coaster' ride
    July 16, 2012
    The Gold Coast region in the Australian state of Queensland is internationally renowned as a tourist area attracting thousands of visitors from Brisbane, where the state's biggest ever road and bridge upgrade project is currently underway. Some 12km of urban route on the south of the Brisbane River is being expanded to take much increased traffic levels: the north is getting a completely new 7km section of motorway on a different alignment to bypass extra traffic, and tolls are being automated to speed flow