Skip to main content

UK’s M3 motorway gets first orange emergency area

The first of a new-style smart motorway emergency stop area is being trialled on the M3 in England. The redesigned emergency area has a highly visible orange road surface and better signs to improve its visibility, according to Highways England, the wholly government-owned company responsible for modernising, maintaining and operating England’s motorways and major A roads.
August 1, 2017 Read time: 2 mins
Safer with an orange: Emergency Refuge Areas using QMS Type 1 HyperGrip system

The first of a new-style smart motorway emergency stop area is being trialled on the M3 in England.

The redesigned emergency area has a highly visible orange road surface and better signs to improve its visibility, according to 8100 Highways England, the wholly government-owned company responsible for modernising, maintaining and operating England’s motorways and major A roads.

Work on the officially-called Emergency Refuge Areas is being done by 8037 WJ in collaboration with maintenance contractors 1146 Balfour Beatty and 184 Colas.

Smart motorways relieve congestion and improve journey times by making the hard shoulder available for use at busy periods. On some schemes, it is permanently converted into a traffic lane, known as All Lane Running.

Spaced emergency refuge areas - ERA - are provided roughly every 2.5km and are clearly marked with blue signs featuring an orange SOS telephone symbol.

This safety upgrade, using QMS Type 1 HyperGrip system, has been delivered on the 21.5km smart motorway scheme, which covers the M3 from junctions 2-4a in Hampshire and Surrey counties. Two emergency refuge areas were completed as z trial and now all ERA’s on the scheme will be afforded the same enhancement.

It is planned now to apply this coloured system on all ERA’s throughout the scheme with other smart motorway contracts expressing interest.

The change is part of an ongoing review into the design and spacing of emergency areas on smart motorways, said Jim O’Sullivan, Highways England chief executive.

Quality Marking Services
%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.qmarkings.co.uk Quality Marking Services Website Link false http://www.qmarkings.co.uk/ false false%>

For more information on companies in this article

Related Content

  • REMU launches Combi E8 screening plant
    April 16, 2013
    Finnish company Remu has launched its new screening plant, the Remu Combi E8. A non-clogging screening plant for preparing topsoil and processing various waste materials, the re-engineered solutions have increased screening capacity by a wider 950mm screening table and a new 2.6m3 feeder unit.
  • CDE’s new German focus
    January 6, 2017
    CDE Global has formed CDE GmbH trading as CDE Deutschland, which has developed from a distribution agreement for southern Germany that was in place between CDE Global and Jurgen Kolsch. The move sees Stefan Kolsch and Sean McCusker assume roles as directors in the new company, which will have exclusive responsibility for the sales, distribution, project management and after sales and service elements of the CDE business in Germany.
  • CDE’s new German focus
    February 13, 2013
    CDE Global has formed CDE GmbH trading as CDE Deutschland, which has developed from a distribution agreement for southern Germany that was in place between CDE Global and Jurgen Kolsch. The move sees Stefan Kolsch and Sean McCusker assume roles as directors in the new company, which will have exclusive responsibility for the sales, distribution, project management and after sales and service elements of the CDE business in Germany.
  • Nylacast is offering long life crane sheaves
    January 6, 2017
    The novel cranes sheaves now being offered by component specialist Nylacast are said to extend rope wear life and reduce maintenance needs. The innovative polymer formulation shares technology with the proven Bigfoot outrigger pads, which help with load distribution in crane lift applications. The new polymer sheaves are said to offer key benefits over existing steel sheaves such as lower weight, which makes them easier to handle during installation or replacement.