Skip to main content

Stopping power: REBLOC’s 120AS_7.5 barrier

The highest containment level H4b offers the best possible protection by safely redirecting errant vehicles and preventing them from breaking through the barrier upon impact. The H4b barrier restrains the impact of a 38tonne truck driving at 65km/h (TB81, according to EN 1317-1/2).
January 13, 2021 Read time: 1 min

The highly versatile REBLOC 120 series can be installed for long-lasting H4b protection on the central reservation and along the verge. Additionally, the product is tested for installation on bridges.

The REBLOC 120AS_7.5 barrier with performance level H4b/W2 has already been installed on several motorways in large scale for the protection of critical bridge structures, such as bridge piers in the median.

The exceptionally low working width W2 means that the required space does not exceed 0.8m and reflects the very low dynamic deflection during impact. Valuable space can be maintained and sufficient width of traffic lanes is ensured. A key feature is the system height of 1.2m which offers effective glare protection.

REBLOC Concrete Barriers ensure a secure and fast installation at any time of the year, day or night, and, above all in any weather. The integrated, innovative coupling does not contain any loose parts. This not only enhances safety and speed of installation but also prevents unauthorised removal and vandalism. REBLOC safety barriers are fully tested to EN1317.

For more information on companies in this article

Related Content

  • Briefly, and to the point
    May 9, 2012
    The low risk found for driving through the tunnel is primarily due to the low volume of traffic of around 11,000 vehicles/day and the ban on HGVs and the transport of hazardous goods. Unidirectional traffic, sufficiently wide lanes, emergency lanes and lighting are the main reasons for the very good result for preventive measures. The tunnel is monitored around-the-clock in a tunnel control centre manned by trained staff, and incidents are automatically reported to the control centre by video link. If neces
  • ARRB Systems' network-level continuous friction testing
    November 20, 2024
    Pavement safety assessments have traditionally focused on discrete low-density friction assessments using proven technology. But more detailed investigations and analysis are now feasible through improved technologies, explains Simon Tetley of ARRB Systems*.
  • Pothole problems cause traffic delays
    April 21, 2023
    Pothole problems are a major cause of traffic delays and vehicle damage in many developed nations
  • Peru’s Oyón -Ambo Highway presents challenges
    August 30, 2022
    Peru’s Oyón-Ambo highway project represents a landmark in construction for the country, while facing significant technical challenges – Paula Chapple, editor of Carreteras Pan-Americana (CPA), writes