Skip to main content

A-one+ gets to gripes with The Blade

UK contractor A-one+ maintenance operatives in England’s southern counties of Kent, Sussex and Surrey are now protected by a new vehicle-fitted crash cushion. The Blade - manufactured by Dutch company Verdegro Blade - is designed to absorb impacts including those by large heavy vehicles that have increased bumper heights. A-one+ said that the Blade is the only crash cushion that has been tested to US MASH crash testing standards, the most demanding in the world. The cushion, when deployed on a vehicle,
November 7, 2017 Read time: 2 mins

UK contractor 2316 A-one+ maintenance operatives in England’s southern counties of Kent, Sussex and Surrey are now protected by a new vehicle-fitted crash cushion.

The Blade - manufactured by Dutch company Verdegro Blade - is designed to absorb impacts including those by large heavy vehicles that have increased bumper heights.

A-one+ said that the Blade is the only crash cushion that has been tested to US MASH crash testing standards, the most demanding in the world.

The cushion, when deployed on a vehicle, extends out 6m.

“Cars and lorries have got bigger and we need tougher protection for our staff working in front of our impact protection vehicles repairing the roads, litter picking or clearing up after accidents,” said Gavin Crittenden, A-one+ transport manager for the region.

“When the cushion is deployed behind an impact protection vehicle, if anything hits it the IPV’s brakes lock and the cushion absorbs all the impact to stop the truck being pushed forward and threatening our operatives, even under braking,” said Crittenden.

The Blade unit measures 6m long by 2.4m wide and its strength comes from a composite aluminium welded profile. The unit has 12 internal “blades”. During an impact four blades cut through the aluminium composite H-beams, with another eight cutting through welded tubes, absorbing the impact. The remaining weak aluminium parts bend away safely.

Alongside the Blade, A-one+ is using a new RedX arrow board on its new protection vehicles. RedX, also manufactured by Verdegro, is designed to match the latest traffic management signage used to signal lane closures on smart motorways.

For more information on companies in this article

Related Content

  • Set the ALARM for repairs in England and Wales
    January 10, 2019
    More than 3,900km of roads in England and Wales will need essential maintenance within the next year, according to the annual ALARM survey* Cash-strapped local governments are reporting that the gap between the funds they received and the amount they needed for repairs and maintenance was almost €639 million. This equated to an average shortfall of €3.75 million for every authority. It would take 14 years to get local roads back into a reasonable steady state, but only if adequate funds and resources wer
  • Digital cameras and VMS improve London and Scottish road safety
    March 18, 2016
    London and Scotland are using VMS and digital cameras to successfully lower road deaths. Road safety measures such as variable message signs (VMS) and digital cameras have boosted road safety in the UK capital London and also in the Scottish Highlands. And the systems need not be a drain on electricity supplies. Full matrix driver information signs from SWARCO Traffic, one of the UK’s leading traffic management technology providers, are being installed for the first time across the Transport for London (TfL
  • TRL wins UK contract from National Highways
    October 29, 2021
    TRL has won a UK pavement survey contract from National Highways.
  • Austria's first PPP project takes shape
    July 31, 2012
    North of the Austrian capital Vienna, one of the region's biggest transport infrastructure projects for decades is currently under construction, the A5 Nordautobahn. This will give the Greater Vienna region its first-ever high-capacity link to the Czech motorway and arterial road network, greatly easing congestion on the old main road. In the first phase of construction, 22.7km of motorway are to be built. Work on the second section, all the way through to the Czech border, is to start in 2010. The A5 Norda