Noise and crash barriers, high strength protection

HOLGATE INFRASTRUCTURE & Motorway Services has supplied vehicle restraint systems and noise attenuation panels to major highway upgrade projects in the UK. The firm has installed Vetex crash barriers and high performance aluminium noise barriers on the M50 Linton upgrade for Alu Griffiths and Amey. Holgate has also supplied the noise barrier package on the M74 Glasgow motorway extension. Interlink M74 Joint Venture, comprising of Balfour Beatty Civil Engineering along with equal joint venture partners Morga
February 15, 2012 Read time: 2 mins
Noise attenuation panels from Holgate are being installed on the M74 project close to Glasgow in the UK
HOLGATE INFRASTRUCTURE & Motorway Services has supplied vehicle restraint systems and noise attenuation panels to major highway upgrade projects in the UK. The firm has installed Vetex crash barriers and high performance aluminium noise barriers on the M50 Linton upgrade for Alu Griffiths and Amey. Holgate has also supplied the noise barrier package on the M74 Glasgow motorway extension. Interlink M74 Joint Venture, comprising of 1146 Balfour Beatty Civil Engineering along with equal joint venture partners Morgan EST, Morrison Construction and Sir Robert McAlpine, are responsible for the contract worth €512 million (£445 million) to design and construct an 8km extension to the M74. This extension will reduce congestion on the busiest stretch of the M8 through Glasgow.

Holgate is providing 12,000m2 of products to reduce noise along this built up route. The product selected was the Holgate High performance Aluminium absorbent system.

Holgate completed a full re-design of the project and the contract also includes the side fixing of reinforced transparent acrylic barriers from to the outside of seven bridge structures.

The contract is the largest single noise barrier project in the UK at present and sets a new standard in noise barrier specification in the UK which is consistent with best practice throughout Europe. Also in Scotland Holgate has recently been awarded the crash barrier contract for the A9 Crubenmore which requires 7.5km of Vetex barrier systems together with P4 terminals.

For more information on companies in this article

Related Content

  • Amey wins Yorkshire maintenance deal
    December 2, 2020
    Asset management company Amey adds to its UK maintenance and response work.
  • THIS is a Paving Project– The I-15 CORE
    December 20, 2012
    Provo, Utah – The scope of the I-15 Corridor Expansion Project (I-15 CORE) in the state of Utah is nearly unprecedented because of the size of the project and the short completion deadline. Twenty-four miles (38.6 km) of removal and replacement of Interstate 15 between Lehi and Spanish Fork, widening the number of traveling lanes by two, for up to six lanes in each direction in 35 months. The new 364 lane miles (586 km) of concrete roadway will be slipformed 12 or 12.5 inches (305 or 318 mm) thick for a tot
  • VIDEO: Balfour starts M3 bridge upgrade in UK following demolition
    November 23, 2016
    Balfour Beatty has started bridge work over the M3 motorway as part of a €205 million upgrade on highway connecting London to south coast ports. Balfour recently demolished the Woodlands Lane Bridge between junctions 2 and 3 near Windlesham on the M3 which runs from the capital to Southampton and Portsmouth. A new bridge is being constructed Balfour Beatty is working for the agency Highways England to reduce congestion this section of the M3 that handles more than 130,000 vehicle journeys every day.
  • Innovative wood and steel safety barriers
    March 9, 2012
    Further development of SCT's wooden and steel barrier systems has led them to meet a wider array of applications. The company has had particular success with its wooden barrier range in areas of natural beauty and hopes to capitalise on this as the wider range comes to market.