Skip to main content

Testing and striping underway for Seattle’s Alaskan Way tunnel

Crews have been working flat out on the Alaskan Way Tunnel in Seattle to install and test thousands of components and 90 interconnected systems. The client, Washing State Department of Transportation, said that Seattle Tunnel Partners began installation inside the double-deck State Route 99 tunnel in March after crews completed construction of the upper and lower roadways. STP said that testing could be complete by as early as late September and the tunnel could open as soon as this fall after an ap
August 31, 2018 Read time: 3 mins
Testing, testing: Seattle Tunnel Partners making sure that equipment and signage operates effectively in the soon-to-open Alaskan Way Tunnel in Seattle (photo courtesy WSDoT)
Crews have been working flat out on the Alaskan Way Tunnel in Seattle to install and test thousands of components and 90 interconnected systems.


The client, Washing State Department of Transportation, said that Seattle Tunnel Partners began installation inside the double-deck State Route 99 tunnel in March after crews completed construction of the upper and lower roadways.

STP said that testing could be complete by as early as late September and the tunnel could open as soon as this fall after an approximate three-week viaduct closure to realign the  SR 99 – called the Alaskan Way - into the new tunnel.

The project is called the Alaskan Way Viaduct Replacement Project after the section of SR 99 in Seattle called the Alaskan Way, a street running along the seafront. Part of the Alaskan Way is an aging 3.2km viaduct – opened in 1953 - which is being replaced by the 2.7km tunnel almost directly beneath it. This will free up waterfront area for major inner city development (see World Highways, %$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 33214 0 link-external key project report false /categories/road-highway-structures/features/bertha-ends-her-alaskan-way-voyage-in-seattle/ false false%>, November 2017).

The multi-layered tests of the tunnel's operational and safety systems includes pre-functional tests to ensure working of individual equipment such as a sprinkler head. Functional tests check that the equipment works together as a system, for example multiple sprinklers. Finally, integrated testing checks that multiple systems function together - heat detectors and video cameras operate with the fire suppression system.

Striping of the road decks inside the tunnel is also continuing. The stripes separate a deck into two 3.3m lanes, a 2.4m shoulder on the left side and a 0.6m buffer on the right.

Kiewit Infrastructure West has started traffic signal, striping and roadway signage work to switch traffic on Alaskan Way from under the viaduct to the west of it. The viaduct will eventually be demolished after the tunnel is opened likely this fall.


Tunnel boring was completed last year by Bertha, the world’s largest diameter earth pressure balance tunnel boring machine at the time, with a cutterhead diameter of 17.5m. By the end of last year it had been dismantled, job completed.

Seattle Tunnel Partners - a joint venture of New York-based 4761 Dragados US (a subsidiary of Dragados, the construction division of ACS Group of Spain) and the general contractor Tutor Perini Corporation, based in California.

Apart from designing and building the tunnel - and owning Bertha - STP is responsible for building highway ramps and other connections at the north and south ends of the tunnel. STP is also constructing permanent buildings at the north and south portal to house lighting, ventilation and other essential tunnel systems

For more information about the Alaskan Way Viaduct Replacement Program, see the website:

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external www.alaskanwayviaduct.org false http://www.alaskanwayviaduct.org/ false false%>

For more information on companies in this article

Related Content

  • Manitou divisions Gehl and Mustang launch high capacity skid steer
    January 6, 2017
    Manitou Group’s two skid steer divisions, Gehl and Mustang, will launch versions of the same 1,815kg capacity skid steer at Bauma. The Gehl V400 and Mustang 4000V are said to be the world’s most powerful skid steers, with a vertical lift height of 3,647mm. The machines use a 74kW (99hp) engine and develop a 40.7kN breakout force.
  • Manitou divisions Gehl and Mustang launch high capacity skid steer
    February 8, 2013
    Manitou Group’s two skid steer divisions, Gehl and Mustang, will launch versions of the same 1,815kg capacity skid steer at Bauma. The Gehl V400 and Mustang 4000V are said to be the world’s most powerful skid steers, with a vertical lift height of 3,647mm. The machines use a 74kW (99hp) engine and develop a 40.7kN breakout force.
  • PPRA Niagara Falls: getting better value for road maintenance budgets
    August 19, 2015
    Larger road budgets would go a long way towards maintaining in top shape highway infrastructure across the United States and Canada. But even considering what is being spent now, are road owners and highway contractors getting the biggest bang for their buck? That’s what delegates to this year’s Pavement Preservation Recycling Alliance conference in the beautiful Canadian resort city of Niagara Falls will find out from October 13-15. “One of the things that I learned in Paris at the first Pavement Preser
  • Hitachi Zaxis 5 wheeled excavators deliver performance
    January 6, 2017
    Hitachi Construction Machinery is showing four models from its Zaxis 5 range of wheeled excavators. The ZX140W-5, ZX170W-5, ZX190W-5 and ZX220W-5 all feature Isuzu Stage IIIB emissions-compliant engines powering the HIOS III hydraulic system. They benefit from increased lifting capacities, as the power boost function has been increased by 11%. The machines have a revised ROPS cab that has been redesigned to improve visibility. A new monitor sits on the right-hand pillar with a rear-view camera providing vis