Skip to main content

Testing and striping underway for Seattle’s Alaskan Way tunnel

Crews have been working flat out on the Alaskan Way Tunnel in Seattle to install and test thousands of components and 90 interconnected systems. The client, Washing State Department of Transportation, said that Seattle Tunnel Partners began installation inside the double-deck State Route 99 tunnel in March after crews completed construction of the upper and lower roadways. STP said that testing could be complete by as early as late September and the tunnel could open as soon as this fall after an ap
August 31, 2018 Read time: 3 mins
Testing, testing: Seattle Tunnel Partners making sure that equipment and signage operates effectively in the soon-to-open Alaskan Way Tunnel in Seattle (photo courtesy WSDoT)
Crews have been working flat out on the Alaskan Way Tunnel in Seattle to install and test thousands of components and 90 interconnected systems.


The client, Washing State Department of Transportation, said that Seattle Tunnel Partners began installation inside the double-deck State Route 99 tunnel in March after crews completed construction of the upper and lower roadways.

STP said that testing could be complete by as early as late September and the tunnel could open as soon as this fall after an approximate three-week viaduct closure to realign the  SR 99 – called the Alaskan Way - into the new tunnel.

The project is called the Alaskan Way Viaduct Replacement Project after the section of SR 99 in Seattle called the Alaskan Way, a street running along the seafront. Part of the Alaskan Way is an aging 3.2km viaduct – opened in 1953 - which is being replaced by the 2.7km tunnel almost directly beneath it. This will free up waterfront area for major inner city development (see World Highways, %$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 33214 0 link-external key project report false /categories/road-highway-structures/features/bertha-ends-her-alaskan-way-voyage-in-seattle/ false false%>, November 2017).

The multi-layered tests of the tunnel's operational and safety systems includes pre-functional tests to ensure working of individual equipment such as a sprinkler head. Functional tests check that the equipment works together as a system, for example multiple sprinklers. Finally, integrated testing checks that multiple systems function together - heat detectors and video cameras operate with the fire suppression system.

Striping of the road decks inside the tunnel is also continuing. The stripes separate a deck into two 3.3m lanes, a 2.4m shoulder on the left side and a 0.6m buffer on the right.

Kiewit Infrastructure West has started traffic signal, striping and roadway signage work to switch traffic on Alaskan Way from under the viaduct to the west of it. The viaduct will eventually be demolished after the tunnel is opened likely this fall.


Tunnel boring was completed last year by Bertha, the world’s largest diameter earth pressure balance tunnel boring machine at the time, with a cutterhead diameter of 17.5m. By the end of last year it had been dismantled, job completed.

Seattle Tunnel Partners - a joint venture of New York-based 4761 Dragados US (a subsidiary of Dragados, the construction division of ACS Group of Spain) and the general contractor Tutor Perini Corporation, based in California.

Apart from designing and building the tunnel - and owning Bertha - STP is responsible for building highway ramps and other connections at the north and south ends of the tunnel. STP is also constructing permanent buildings at the north and south portal to house lighting, ventilation and other essential tunnel systems

For more information about the Alaskan Way Viaduct Replacement Program, see the website:

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external www.alaskanwayviaduct.org false http://www.alaskanwayviaduct.org/ false false%>

For more information on companies in this article

Related Content

  • PPRS event: Road users’ concerns at the heart of the programme
    December 19, 2014
    Europeans are in two minds about whether their road transport has improved in the past five years, according to the latest European Commission’ Eurobarometer survey and report. According to 38% of respondents, road transport quality had gone up, but 40% said it had dropped, while 18% said there had been no change. Whatever the opinion on quality, 60% of respondents to the report’s survey considered congestion to be the most serious issue facing Europe’s roads. The survey highlighted the dominance o
  • IronPlanet has added appraisal services to its capabilities
    January 6, 2017
    Auction specialist IronPlanet has acquired Asset Appraisal Services (AAS), an inspection, appraisal and online auction services company. Asset Appraisal Services (AAS) has developed a range of creative remarketing offerings for its customers, including auction services. The company will operate as a wholly owned subsidiary of IronPlanet and continue to use the respected Asset Appraisal Services name.
  • IronPlanet has added appraisal services to its capabilities
    March 11, 2013
    Auction specialist IronPlanet has acquired Asset Appraisal Services (AAS), an inspection, appraisal and online auction services company. Asset Appraisal Services (AAS) has developed a range of creative remarketing offerings for its customers, including auction services. The company will operate as a wholly owned subsidiary of IronPlanet and continue to use the respected Asset Appraisal Services name.
  • Bonfiglioli is launching heavy duty drives for large machines
    January 6, 2017
    Bonfiglioli Trasmital has developed a new series of travel drive gearboxes for use in large, heavy duty tracked machines. The firm is now offering three new product sizes, the 722C, 724C and 726C, which extend its range of tracked travel drives. The 722C develops a maximum torque of up to 330,000Nm, making it suitable for use on excavators of 120-150tonnes, as well as cranes and drilling rigs of 180-230tonnes. The 724C develops a maximum torque of up to 450,000Nm, and is specially designed for large cranes