Skip to main content

Testing and striping underway for Seattle’s Alaskan Way tunnel

Crews have been working flat out on the Alaskan Way Tunnel in Seattle to install and test thousands of components and 90 interconnected systems.The client, Washington State Department of Transportation, said that Seattle Tunnel Partners began installation inside the double-deck State Route 99 tunnel in March after crews completed construction of the upper and lower roadways. STP said that testing could be complete by late September and the tunnel could open as soon as this fall after an approximate three-w
October 18, 2018 Read time: 3 mins
The stripes separate a deck into two 3.3m lanes, a 2.4m shoulder on the left side and a 0.6m buffer on the right (photo courtesy WSDoT)

Crews have been working flat out on the Alaskan Way Tunnel in Seattle to install and test thousands of components and 90 interconnected systems.The client, 914 Washington State Department of Transportation, said that Seattle Tunnel Partners began installation inside the double-deck State Route 99 tunnel in March after crews completed construction of the upper and lower roadways.

STP said that testing could be complete by late September and the tunnel could open as soon as this fall after an approximate three-week viaduct closure to realign the  SR 99 – called the Alaskan Way - into the new tunnel.

The project is called the Alaskan Way Viaduct Replacement Project after the section of SR 99 in Seattle called the Alaskan Way, a street running along the seafront. Part of the Alaskan Way is an ageing 3.2km viaduct – opened in 1953 - which is being replaced by the 2.7km tunnel almost directly beneath it. This will free up waterfront area for major inner city development (see World Highways, Key Project Report, November 2017).

The multi-layered tests of the tunnel's operational and safety systems includes pre-functional tests to ensure working of individual equipment such as a sprinkler head. Functional tests check that the equipment works together as a system, for example multiple sprinklers. Finally, integrated testing checks that multiple systems function together - heat detectors and video cameras operate with the fire suppression system.

Striping of the road decks inside the tunnel is also continuing. The stripes separate a deck into two 3.3m lanes, a 2.4m shoulder on the left side and a 0.6m buffer on the right.

Kiewit Infrastructure West has started traffic signal, striping and roadway signage work to switch traffic on Alaskan Way from under the viaduct to the west of it. The viaduct will eventually be demolished after the tunnel is opened, likely this fall.

Tunnel boring was completed last year by Bertha, the world’s largest diameter earth pressure balance tunnel boring machine at the time, with a cutterhead diameter of 17.5m. By the end of last year it had been dismantled, job completed.

Seattle Tunnel Partners is a joint venture of New York-based 4761 Dragados US (a subsidiary of Dragados, the construction division of ACS Group of Spain) and the general contractor Tutor Perini Corporation, based in California.

Apart from designing and building the tunnel - and owning Bertha - STP is responsible for building highway ramps and other connections at the north and south ends of the tunnel. STP is also constructing permanent buildings at the north and south portal to house lighting, ventilation and other essential tunnel systems.

For more information on companies in this article

Related Content

  • Ghana moves to reduce Accra’s road pollution and congestion
    August 28, 2019
    The west African country of Ghana has commissioned a traffic management centre to alleviate chronic congestion and drastically reduce vehicle pollution in the capital Accra. Nana Akufo-Addo, Ghana’s president, welcomed the opening of the centre, saying the increase in traffic “coupled with rapidly increasing urban population is putting a lot of pressure on facilities in our cities, especially on our road infrastructure and also sapping productivity”. The centre, which local media claim is the first of
  • Leighton scores hat-trick of Hong Kong Central – Wan Chai Bypass tunnel jobs
    February 21, 2014
    Leighton Asia, India and Offshore has secured a contract worth US$408.14 million to construct the tunnel buildings, systems and fitting out works associated with the Central - Wanchai Bypass (CWB) tunnel in Hong Kong. This is the third project to be awarded to Leighton on the Central - Wanchai Bypass (CWB) project by the HKSAR's Highways Department, following the award of the 2010 contract for the construction of the Central Interchange and the Central Reclamation Phase III in 2009.
  • Testing time for Tlicho all-season gravel road in Canadian north
    January 27, 2020
    Contractors on the 97km Tlicho all-season gravel road in Canada’s far north are on site despite not having all proper approvals, according to Canadian media.
  • Asphalting in the Americas
    June 13, 2012
    Asphalt plants were recently delivered for use in the biggest road construction project in Latin America. Meanwhile, a US navy base has just received a plant Guy Woodford reports Spanning around 1,000km, the Ruta del Sol highway in Colombia is the largest road build works currently taking place in Latin America. Brazilian company Odebrecht, part of the Ruta del Sol Concessionaire group working on sector 2 of the highway stretching 528km from Puerto Salgar to San Roque, connecting the capital Bogota to the