Skip to main content

Call for action on road markings

In Staffordshire, in the West Midlands region of England, some residents are reported to be so fed-up of waiting for traffic lines to be painted on roads by the local county council that they are threatening to do it themselves. Staffordshire County Council highways bosses say they can only take on four new traffic measure projects a year and have a waiting list stretching to 2028. Media outlets in the county report that the local authority currently has more than 70 requests from all over Stafford borough
March 16, 2012 Read time: 2 mins
In Staffordshire, in the West Midlands region of England, some residents are reported to be so fed-up of waiting for traffic lines to be painted on roads by the local county council that they are threatening to do it themselves.

Staffordshire County Council highways bosses say they can only take on four new traffic measure projects a year and have a waiting list stretching to 2028.

Media outlets in the county report that the local authority currently has more than 70 requests from all over Stafford borough for traffic measures, which are due to be examined.

These include calls for double yellow lines, parking restrictions, disabled parking bays, school keep clear marks and waiting time restrictions.

Speaking to the Staffordshire Newsletter, County Councillor Len Bloomer said: “I worked out it will be 2028 before we clear the backlog. I could quite easily go round my patch and add another six. The list is too big. Something has got to be done about it.”

It is reported that Stafford Borough and Staffordshire County councillors intend to lobby the Government for a change in legislation to cut red tape surrounding traffic management orders.

Related Content

  • Kenya develops annuity road funding model
    May 8, 2015
    Kenya is introducing novel methods for funding its necessary road infrastructure development - Shem Oirere writes. Kenya has unveiled a new financing model for road construction and reviewed its design standards and construction methodologies, which forms part of a new strategy for the East African country. Under this new plan Kenya is planning to upgrade 10,000km of road, with these links featuring asphalt surfacing; the work being carried out over the next five years at a cost of US$2.8 billion. Despite t
  • Mixing recycled and fresh asphalt reduces costs
    February 14, 2012
    An innovative asphalt plant is allowing the use of recycled materials and achieving major cost benefits - Mike Woof reports. UK construction firm FM Conway is seeing the benefit of the €11.5 million (£10 million) it has invested in its asphalt production facilities at Erith in Kent, close to UK capital London, since buying the site in 2005. The biggest single investment in the facility has been a new Benninghoven asphalt plant, which was commissioned in June 2010 and is now the core of the Erith operation.
  • ALARMing UK road statistics, from the Asphalt Industry Alliance
    March 27, 2017
    Within years, one in six of UK local roads will need repairs or face closure, according to the latest Annual Local Authority Road Maintenance – ALARM - survey. The cumulative effect of an ageing network, decades of underfunding, increased traffic and wetter winters has led to around 17% of all local roads reportedly in poor structural condition, with less than five years of life remaining. The 22nd annual ALARM survey is a comprehensive study into local road maintenance funding and conditions. Loca
  • Training as well as test equipment is a must for emerging markets
    April 27, 2015
    Emerging markets, such as North and East Africa, are developing an appetite for materials testing equipment, but suppliers need to provide expertise and training as well as a broad range of machines, as Kristina Smith finds out Asking what sort of testing equipment is required for Africa is a little bit like asking what sort of food Europeans like to eat. The answer is that requirements vary enormously from the most basic and ancient of tests to the very cutting edge of dynamic testing. “You have some