Skip to main content

Call for action on road markings

In Staffordshire, in the West Midlands region of England, some residents are reported to be so fed-up of waiting for traffic lines to be painted on roads by the local county council that they are threatening to do it themselves. Staffordshire County Council highways bosses say they can only take on four new traffic measure projects a year and have a waiting list stretching to 2028. Media outlets in the county report that the local authority currently has more than 70 requests from all over Stafford borough
March 16, 2012 Read time: 2 mins
In Staffordshire, in the West Midlands region of England, some residents are reported to be so fed-up of waiting for traffic lines to be painted on roads by the local county council that they are threatening to do it themselves.

Staffordshire County Council highways bosses say they can only take on four new traffic measure projects a year and have a waiting list stretching to 2028.

Media outlets in the county report that the local authority currently has more than 70 requests from all over Stafford borough for traffic measures, which are due to be examined.

These include calls for double yellow lines, parking restrictions, disabled parking bays, school keep clear marks and waiting time restrictions.

Speaking to the Staffordshire Newsletter, County Councillor Len Bloomer said: “I worked out it will be 2028 before we clear the backlog. I could quite easily go round my patch and add another six. The list is too big. Something has got to be done about it.”

It is reported that Stafford Borough and Staffordshire County councillors intend to lobby the Government for a change in legislation to cut red tape surrounding traffic management orders.

Related Content

  • Using aspahlt testing equipment improves efficiency
    May 28, 2013
    From density tests on a Mongolian gold mine project to an all-singing, all-dancing asphalt tester, Kristina Smith reports on some of the latest new products in materials testing. Perhaps understandably, nuclear density gauges can present contractors with some order to move them at all. “One of the problems with nuclear soil gauges is the restrictions on movement,” said John Lamond, Manufacturing. “If you are a contractor projects cross-border, it’s a real challenge to move a nuclear density gauge around.”
  • WheelRight’s John Catling says put the brakes on under-inflation
    September 30, 2016
    It’s official – Britain’s tyres are unloved and under-inflated, according to recent research. But WheelRight’s chief executive, John Catling, believes that the research results are indicative of a global problem.
  • New concrete testing technologies improve speed, safety and quality
    July 8, 2016
    Developments in data processing and management are revolutionising the way concrete strengths can be measured and used to improve efficiencies - Kristina Smith reports on two new technologies A new system that uses thermal imaging to measure the strength of sprayed concrete tunnel linings is being trialled for the first time in London. The brainchild of Dr Benoit Jones, managing director of Inbye Engineering, the technique could lead to improvements in safety, quality and – in the longer run – productivi
  • Trimble helps bring Indonesia up to speed on the latest heavy construction technology
    March 28, 2014
    Indonesian infrastructure investment is seeing major highway expansion - Simon Gould writes Over the next 12 years, Indonesia has planned some massive infrastructure investments, under a master plan aimed at bringing it up to developed country status by 2025. Its Government’s Masterplan for Acceleration and Expansion of Indonesia's Economic Development (MP3EI) envisages infrastructure spending of US$400 billion between 2011 and 2025 to help achieve this (see sidebar for more on MP3EI). With limited funds of