Skip to main content

Key Colombian highway deals awarded

Colombia’s Villavicencio-Yopal highway will be built by the consortium Estructura Plural Arauca (Conecol-Episol). The package of works was awarded by Colombia's National Infrastructure Agency (ANI). This deal forms part of the group of tenders for the second tranche of Colombia’s 4G roads programme. All nine of the 4G roads projects will be awarded by 15th July 2015. Under the Villavicencio-Yopal highway concession, the consortium must develop 261km of the route with an investment of US$741.9 million. The n
June 5, 2015 Read time: 2 mins
Colombia’s Villavicencio-Yopal highway will be built by the consortium Estructura Plural Arauca (Conecol-Episol). The package of works was awarded by Colombia's National Infrastructure Agency (ANI). This deal forms part of the group of tenders for the second tranche of Colombia’s 4G roads programme. All nine of the 4G roads projects will be awarded by 15th July 2015. Under the Villavicencio-Yopal highway concession, the consortium must develop 261km of the route with an investment of US$741.9 million. The new highway will directly benefit some 810,000 people living in Sabanalarga, Villavicencio, Yopal (Casanare), Cumaral, Paratebuento (Cundinamarca), Tauramena, Restrepo, Aguazul, Barranca de Upia (Meta), Monterrey and Villanueva. The route should take four years to build and is expected to generate 9,400 direct jobs during its construction. The work will help improve the existing Marginal del Llano arterial road connecting Meta with Casanare by providing additional lanes, as well as new junction at Cumaral. The project also involves the construction of 32 new bridges and 39 pedestrian walkways, in addition to widening 87 existing bridges, the construction of six underpass intersections and the development of three above-ground intersections.

Related Content

  • Lane Construction to carry out Florida highway deal
    November 24, 2017
    Lane Construction Corporation will carry out construction work worth US$134.6 million on a stretch of highway in Florida. This 21km section of the new Suncoast Parkway 2 will run to the north of Tampa, along Florida’s western coast. The route is intended to be a major transport corridor for the state and will feature four lanes. Called SR 589, the tolled route will run from South of SR 700 (US 98) to SR 44 in Hernando and Citrus Counties. Lane Construction is building the second of two sections of the Sunco
  • US$176.6 million Oman expressway underway
    August 12, 2024
    Construction of a US$176.6 million Oman expressway project is underway.
  • Paso de las Leña tunnel between Argentina and Chile
    December 22, 2016
    A new tunnel between Chile and Argentina will boost trade and transport between the two countries - Mauro Nogarin writes The international Tunnel Paso Las Leñas will stretch 11.5km at 2,050m above sea level through the Andes. Once complete, it will greatly improve the connectivity and integration between the Chilean O'Higgins region with the Argentine Mendoza region.
  • Colombia road project tender process
    July 22, 2019
    The tender process for Colombia’s Buga-Buenaventura fourth generation (4G) toll road project is being planned. The tender for the 114.1km dual carriageway is being handled in two separate stretches however. One of the road stretches will be for a 55.4km section from Buga to Loboguerrero, which is expected to cost US$359.45 million. The 58.7km stretch from Loboguerrero to Buenaventura meanwhile is expected to cost $362.75 million. The Loboguerrero to Buenaventura section of the route includes building a 19km