Skip to main content

Ivory Coast bridge deal for French firms

The reconstruction work for an important bridge link in Côte d'Ivoire’s capital, Abidjan, will be carried out by two French contractors. Eiffage and Spie Batignolles are to rebuild Abidjan’s Félix Houphouët-Boigny Bridge. Funding for the work is being provided by the French Development Agency (AFD). The project has a contract value of US$62.73 million and the work is expected to take 30 months to complete.
December 1, 2017 Read time: 1 min
The reconstruction work for an important bridge link in Côte d'Ivoire’s capital, Abidjan, will be carried out by two French contractors. 5871 Eiffage and 3630 Spie Batignolles are to rebuild Abidjan’s Félix Houphouët-Boigny Bridge. Funding for the work is being provided by the French Development Agency (2825 AFD). The project has a contract value of US$62.73 million and the work is expected to take 30 months to complete.

For more information on companies in this article

Related Content

  • Kenya’s bridge maintenance woes persist
    May 10, 2018
    Many of Kenya’s bridges are in poor condition writes Shem Oirere. The lack of programmed maintenance of bridges in Kenya continues to undermine the structural integrity of the infrastructure and compromising their general usage safety despite the existence of approved measures to protect them from falling into a state of disrepair. Experts think that both the absence of a maintenance component in bridge construction contracts, especially for those built one or two decades ago, and a weak maintenance supervi
  • Upgrade for Medieval bridge
    February 29, 2012
    One of the most demanding and challenging impressed current cathodic protection (ICCP) projects ever undertaken by specialist main contractor Concrete Repairs Ltd (CRL) is being carried out on Bideford Longbridge in County Devon, UK. The 24-span medieval masonry arch bridge spans 190m over the tidal estuary of the River Torridge.
  • Algeria signs off two contracts of Hauts Plateaux motorway work
    January 5, 2015
    The Algerian Council of Ministers has approved two contracts for stretches of road on the Hauts Plateaux motorway. No details of the contractors were given for the work that is to link Lambidiri to Draa Lahmar via Ouled Fadhel. Construction is expected to take 18 months. Last March, World Highways reported that work on the 1,000km Hauts-Plateaux motorway project was to begin that month. Construction cost for motorway’s 10 sections was estimated to be around US$8.94 billion, according to Algerian Minis
  • New Tajikistan highway secures funding
    May 9, 2019
    A new highway project in Tajikistan has secured a funding package worth US$350 million in all.