Skip to main content

Kentucky’s 1931 Ledbetter road Bridge comes to an explosive end

Specialist demolition contractors working for the Kentucky Transportation Cabinet have successfully brought down one truss span of the Old Ledbetter Bridge near Paducah. The bridge has been taking traffic across the Mississippi River since 1931. Boat traffic on the Tennessee River was halted for about 90 minutes by the U.S. Coast Guard. KYTC said there were several audible warning signals, then a countdown, followed by a flash and puff of smoke from the explosive charges. As sound of the explosion echoed a
October 1, 2014 Read time: 2 mins
Specialist demolition contractors working for the Kentucky Transportation Cabinet have successfully brought down one truss span of the Old Ledbetter Bridge near Paducah. The bridge has been taking traffic across the Mississippi River since 1931.

Boat traffic on the Tennessee River was halted for about 90 minutes by the U.S. Coast Guard. KYTC said there were several audible warning signals, then a countdown, followed by a flash and puff of smoke from the explosive charges. As sound of the explosion echoed along the river banks, KYTC said the steel truss dropped into about 30 feet (10m) of water below the bridge.

Once an all-clear was issued, river traffic was allowed to resume and a crane was moved in to start pulling steel from the river. The constractor believes it should take about 48 hours to remove the steel and place it on barges to be hauled to a scrap yard.

See it happen on the video below, which was forwarded to World Highways by Demolition News website:

Related Content

  • Key UK bridge project for A38
    October 29, 2024
    A key UK bridge project for the A38 over the HS2 route.
  • Canadian manufacturer of remote-controlled GOTCHA! eyes Europe
    February 11, 2015
    With a brief but loud safety warning sound, one of the latest construction equipment inventions for sling operations drops its load, in this case a very light load. Daniel Hebert, vice president of the Canadian firm Crane Equipment.ca, was recently demonstrating the aptly-named GOTCHA! device that the Quebec-based company will be highlighting at the Intermat exhibition in Paris in April. GOTCHA! Is an automated sling release that uses a remote control to release loads being moved by crane. With the press
  • Canadian manufacturer of remote-controlled GOTCHA! eyes Europe
    January 6, 2017
    With a brief but loud safety warning sound, one of the latest construction equipment inventions for sling operations drops its load, in this case a very light load. Daniel Hebert, vice president of the Canadian firm Crane Equipment.ca, was recently demonstrating the aptly-named GOTCHA! device that the Quebec-based company will be highlighting at the Intermat exhibition in Paris in April. GOTCHA! Is an automated sling release that uses a remote control to release loads being moved by crane. With the press
  • LagoonHull still on the cards
    February 7, 2022
    A proposed major river development in Hull would include an immersed road tunnel to connect traffic arriving from Europe with the UK’s motorway network.