Skip to main content

Israeli contractor using Hitachi excavator for road construction

In Israel a specialist contractor is using a new Hitachi excavator for major earthmoving work on the Road 65 construction project in the north of the country. Hilkiyahu’s ZX670LCH-5 has already clocked over 1,100 working hours, excavating and loading 1.5million m³ of materials on the upgraded route.
December 4, 2014 Read time: 2 mins
Israeli contractor is making use of Hitachi excavators for use in road building and quarrying

In Israel a specialist contractor is using a new Hitachi excavator for major earthmoving work on the Road 65 construction project in the north of the country. Hilkiyahu’s ZX670LCH-5 has already clocked over 1,100 working hours, excavating and loading 1.5million m³ of materials on the upgraded route.

The company took delivery of the large Zaxis-5 machine from the 233 Hitachi dealer in Israel, CMD, in December 2013. The machine was supplied with a 4.2m³ rock bucket and two-year/6,000-hour extended warranty to join Hilkiyahu’s expanding fleet of seven excavators.

Road 65 is a major highway that connects the Hadera (central) and Galilee (northern) regions via the shortest and easiest route. The current project is to widen the road between the Golani and new Nahal Amud interchanges. A second carriageway is being added, which will provide for two lanes in each direction, along with eight new junctions and a bridge. The earthmoving work between Masad and the Nahal Amud junction began in November 2013 and the whole project is scheduled for completion within the next two years.

The firm is working as a sub-contractor on the third section of the new road, which is 13km long. Its job is to complete all of the earthmoving, drainage, blasting and breaking of the rocks, and add the base layers to the road, before another contractor lays the asphalt. In addition the firm is operating a ZX470LCH-3 in a nearby quarry, which is supplying aggregates for the road.

For more information on companies in this article

Related Content

  • Panama City’s Tumba Muerto-Via Israel road upgrade to end in December 2013
    September 24, 2013
    The US$396 million upgrade of the Tumba Muerto-Via Israel road in Panama City, including four flyovers and four tunnels to alleviate traffic jams, is expected to be completed by the end of December 2013. More than 630,000 drivers will benefit directly when section one of the scheme, costing $216 million, is inaugurated in 15 days. Section two, which is 80% complete, requires a $180 million investment and will benefit 250,000 drivers. It is expected to open at the end of October 2013. Meanwhile, minist
  • Canadian air
    February 8, 2012
    Compressors from Atlas Copco are proving highly useful in highly diverse applications, on a bridge project and a quarry in Canada. Water ingress over 30 years has damaged a road bridge in Quebec City, Canada, deteriorating the concrete and breaking down the rubber expansion joints at both ends of the 150m long structure. City highway authority, Transportes Quebec, awarded local contracting company Inter-Structures the contract to replace the deteriorated concrete and fit new membrane seals. The bridge, clos
  • Doosan’s DA30-5 ADT make the grade in the UK and Norway
    March 29, 2017
    Doosan’s DA30-5 Stage IV/Tier 4 Final compliant articulated dump trucks are proving popular in the UK and Norway. Contractor Lyndon Thomas, based in Northampton in the UK, recently took delivery of eight new Doosan DA30-5 ADTs, the biggest single order for Doosan trucks in the UK.
  • Wirtgen: low-emission recycling near Legoland
    March 22, 2024
    Wirtgen, Vögele and Hamm were on a section of the busy E45 highway close to the famous Legoland resort at Billlund, Denmark.