Skip to main content

UK’s Humber Bridge Board to deploy automatic tolling system

The Humber Bridge Board in the UK is set to deploy an automatic tolling system at the famous structure near Kingston upon Hull in northern England from the autumn of 2014 to the spring of 2015. The number of manual payment toll booths is being reduced to three from six to accommodate two free-flow lanes and automatic tolling infrastructure. The updated booths are anticipated to be operational in June 2014 or early July 2014. Until the installation of the automated system is complete, the toll booths will co
May 13, 2014 Read time: 1 min
The Humber Bridge Board in the UK is set to deploy an automatic tolling system at the famous structure near Kingston upon Hull in northern England from the autumn of 2014 to the spring of 2015. The number of manual payment toll booths is being reduced to three from six to accommodate two free-flow lanes and automatic tolling infrastructure. The updated booths are anticipated to be operational in June 2014 or early July 2014. Until the installation of the automated system is complete, the toll booths will continue accepting manual payments. One staffed booth will also continue to operate.

Related Content

  • Drivewyze: US e-inspections on the rise
    February 18, 2022
    Drivewyze says that its weigh station programme is in a phase-one deployment that expedites CSA-crediting Level III inspections in station in the US.
  • Brazil’s Serra do Cafezal Highway
    July 29, 2015
    Brazil's improved Mercosur route will boost capacity and cut travel time - Mauro Nogarin writes. The Régis Bittencourt Highway is one of the main access routes of the Mercosur traffic. It has a length of 400km and connects the main cities of São Paulo and Curitiba, which allows for products to enter from the southeast toward the rest of the southern part of Brazil and later transit to Argentina, Paraguay and Uruguay. Products also flow into Brazil from Mercosur through this major highway. The cost of the hi
  • Bridge monitoring technology
    July 1, 2019
    A new partnership between SGS and AIMSight is allowing fully remote continuous structural health monitoring (SHM) of bridges. This utilises using smart crack monitoring sensors and data analytics and is compliant with existing NDT standards. The new SGS AIMSight structural health monitoring solution provides continuous, real time monitoring of the health of critical assets to a higher level of precision than conventional SHM systems and structural inspection schemes. This serves as an early warning system
  • New bridge over Nile will help landlocked Uganda
    April 3, 2013
    A new River Nile bridge is essential to boost trade and improve traffic in landlocked Uganda. Shem Oirere reports A new bridge across the River Nile at Jinja, to be constructed by Uganda, is promising to boost trade in eastern Africa and pave the way for smooth and safe traffic in and out of this landlocked country. The bridge, also known as the Second Nile Bridge, is the first cable-stayed bridge in the region and will be constructed at Njeru, 80km east of the Ugandan capital Kampala, along the Kampala-Jin