Skip to main content

UK’s Humber Bridge Board to deploy automatic tolling system

The Humber Bridge Board in the UK is set to deploy an automatic tolling system at the famous structure near Kingston upon Hull in northern England from the autumn of 2014 to the spring of 2015. The number of manual payment toll booths is being reduced to three from six to accommodate two free-flow lanes and automatic tolling infrastructure. The updated booths are anticipated to be operational in June 2014 or early July 2014. Until the installation of the automated system is complete, the toll booths will co
May 13, 2014 Read time: 1 min
The Humber Bridge Board in the UK is set to deploy an automatic tolling system at the famous structure near Kingston upon Hull in northern England from the autumn of 2014 to the spring of 2015. The number of manual payment toll booths is being reduced to three from six to accommodate two free-flow lanes and automatic tolling infrastructure. The updated booths are anticipated to be operational in June 2014 or early July 2014. Until the installation of the automated system is complete, the toll booths will continue accepting manual payments. One staffed booth will also continue to operate.

Related Content

  • Plans moving forward for key Turkish highway
    October 11, 2013
    Plans are moving forward in Turkey for the construction of a new highway project. Mott MacDonald has been named lenders’ technical advisor by the IC Ictas-Astaldi (ICA) consortium for a 60km section of the Northern Marmara highway. This deal is significant and the stretch forms the first of a number of phases of the highway. The project is being delivered under a 10 year, US$2.5 billion public-private partnership (PPP).
  • Tougher roads
    January 2, 2013
    Designing structures and pavements to accommodate warmer weather and more extreme temperatures. On October 22nd, IRF held a notable workshop on environmental protection and the impacts of climate change in Cordoba, Argentina, in conjunction with the XVI Argentine Congress of Road Administration and Traffic. The workshop addressed a topic of key concern to transportation planning and design professionals around the world. The discussion was animated by guest panellists Professor Ram M Pendyala and Gordon Rex
  • Tougher roads
    January 22, 2013
    Designing structures and pavements to accommodate warmer weather and more extreme temperatures On October 22nd, IRF held a notable workshop on environmental protection and the impacts of climate change in Cordoba, Argentina, in conjunction with the XVI Argentine Congress of Road Administration and Traffic. The workshop addressed a topic of key concern to transportation planning and design professionals around the world. The discussion was animated by guest panellists Professor Ram M Pendyala and Gordon Rex
  • Clever approach to reducing bridge vibrations
    November 14, 2013
    Reducing vibrations on a bridge, supplying high-quality binders to emerging countries and helping small and medium players with warm mix, this month’s stories showcase some innovative bitumen technology solutions - Kristina Smith reports The Kessock Bridge in the Highlands of Scotland has become the third bridge in the UK to be resurfaced with Gussasphalt. A dense mastic asphalt containing Nynas Endura N5, a polymer modified binder, Gussasphalt has been designed to have a longer life than standard mastic as