Skip to main content

Ulma Construction expands circular formwork offering with Biramax

Spanish company Ulma Construction said that is has developed Biramax in an effort to create adjustable formwork at once easy to assemble and profitable for the client, in terms of both use and durability. The adjustable circular formwork Biramax has only four adjustment points and the placement of compensation plates between panels is easy to accomplish. The panel frame is made of the high-quality and resistant galvanised steel and the plastic surface of the formwork panels is highly moisture resista
October 28, 2016 Read time: 2 mins
Spanish company Ulma Construction said that is has developed Biramax in an effort to create adjustable formwork at once easy to assemble and profitable for the client, in terms of both use and durability.

The adjustable circular formwork Biramax has only four adjustment points and the placement of compensation plates between panels is easy to accomplish.

The panel frame is made of the high-quality and resistant galvanised steel and the plastic surface of the formwork panels is highly moisture resistant. Ulma says that this means it’s easy to maintain and repair and the plastic-coated plywood panels offers excellent concrete finishes.

Biramax formwork has a minimum curvature radius of 2m and is resistant to high concrete pressures, up to 80kN/m2. Various platforms are available that guarantee worker safety both during assembly of the system and concrete-pouring phases.

The development of Biramax has been possible through the company’s continuous programme of research and customer feedback that has focused on safety and efficiency for the work force that translates into profitability for its clients.

Ulma said that Biramax complements its ENKOFORM VMK and ENKOFORM V-100 timber beam formwork to shape any circular wall, whether it be of varied or fixed radius, for installations such as water tanks, storage areas and tunnels.

Ulma’s global projects include the El Salto Viaduct near Santiago, Chile,  the bypass road and motorway in Port of El Salvador, Brazil, and the 34km motorway A4 and overpass E118 on the Tarnów – Dębica route in Poland.

Related Content

  • UK tourist A591 road in Cumbria gets repaired after storm damage
    June 17, 2016
    The UK’s A591 road in Cumbria was badly damaged in last December’s storms but recent work on a retaining wall is making life easier for construction crews. The vital Lake District tourist route, which stretches between Grasmere and Keswick, has been closed between St Johns in the Vale and Dunmail Raise following storms Desmond and Eva. A new 106m retaining wall - the length of a football pitch - is being built in the beck alongside the part of the A591 which collapsed during the bad weather. Contractors
  • LafargeHolcim wins Highway 1 deal in Vancouver, Canada
    July 1, 2019
    LafargeHolcim has been awarded infrastructure contracts worth more than US$73.5 million as part of a major Highway 1 improvement project in Vancouver, Canada.
  • Peri cantilever for Terfener Bridge
    February 26, 2021
    Peri used its VBC Balanced Cantilever Carriage for the first time in Central Europe.
  • New excavators dig more efficiently
    March 18, 2016
    Increased performance and more durable construction are key features of new generation excavators – Mike Woof writes. All the major equipment manufacturers are introducing new hydraulic excavators to meet market demand. These machines are offering increased output at the same time as producing lower emission levels and burning less fuel than before. From Caterpillar for instance comes its new 330F, which features a maximum operating weight of 29.75tonnes and is powered by a 178kW Cat C7.1 ACERT diesel that