Skip to main content

New bridge surfacing

A new wearing course applied by Bolidt on the entire eastern section of the Erasmus Bridge in Rotterdam is helping improve the surface for road users. The bridge forms an important link in the centre of the city of Rotterdam and using its equipment Bolidt was able to apply 3,000m2 of new wearing course on Erasmus Bridge in 4 hours. The Rotterdam authorities commissioned Bolidt again after the previous surface the firm applied, its Bridgedeck Up product, lasted over a decade. This time the work was carried o
February 6, 2012 Read time: 2 mins
Using Bolidt's technology to resurface a Rotterdam bridge cut installation time
A new wearing course applied by 2291 Bolidt on the entire eastern section of the Erasmus Bridge in Rotterdam is helping improve the surface for road users. The bridge forms an important link in the centre of the city of Rotterdam and using its equipment Bolidt was able to apply 3,000m2 of new wearing course on Erasmus Bridge in 4 hours. The Rotterdam authorities commissioned Bolidt again after the previous surface the firm applied, its Bridgedeck Up product, lasted over a decade. This time the work was carried out using a machine developed by Bolidt, speeding installation.

Although the previous wearing course was still intact, the decision to replace it was made as part of a maintenance operation. Over one weekend, the entire eastern section of the bridge was resurfaced with a new wearing course and lining. The work was carried out in less than 36 hours due to the equipment used and this high productivity was of key importance as Rotterdam has a heavy traffic load and a prolonged closure would have resulted in serious congestion.

The Bolimix machine was developed by Bolidt originally for the application of wearing courses on concrete bases. The Erasmus Bridge has a steel base, which requires a different type of wearing course and Bolidt had to adapt the machine especially for the work. Exchangeable tanks, allowing a short conversion time, were made to achieve this. Where in the past it was necessary to have several days of dry weather, this has now been reduced to approximately 1.5 days. After the wearing course has been applied, rain no longer forms a hindrance.

For more information on companies in this article

Related Content

  • Bitumen provides more durable road surface
    February 7, 2012
    When the main commuter route into Cardiff, the Welsh capital, began to suffer from acute deformation, the Vale of Glamorgan Council required a durable and faster alternative to hot rolled asphalt to ensure minimum disruption for local road users.
  • Cold winters ravage roads requiring repairs
    January 7, 2015
    Detroit is one of the three worst cities in the US for poor weather, along with Chicago and Toledo For Metro Detroit the winter of 2013-14 was the second snowiest season on record, bested only by the winter of 1880-1881. This had a terrible effect on the city’s roads and in the suburb of Southfield, officials assessed the poor state of the asphalt and concrete streets and realised the conventional patch and fill programme would not be sufficient.Instead the contract was modified to cover mill and resurfacin
  • Tunnel project of Chilean capital Santiago
    April 8, 2015
    Tunnel construction in Chilean capital Santiago will help cut chronic congestion – Mauro Nogarin & Mike Woof write. Chile’s capital Santiago is a thriving city having benefited from the country’s economy growing strongly in recent years. The massive copper mining sector has helped boost the country’s GDP significantly in the past few decades, also aided by the growing international reputation of Chile’s large wine industry. The steady economic growth has resulted in an equally steady growth in average incom
  • Ciber’s iNOVA 2000 plant for Latin America market
    August 25, 2016
    Now part of the Wirtgen Group, Brazilian firm CIBER produces asphalt plants for the Latin American market and has developed a series of technological innovations for this sector. The firm is now introducing its new iNOVA 2000 plant design that it will offer for Latin America. The firm has developed the machine based on its experience of the sector, while also incorporating the latest advances in asphalt plant technology. The plant has benefited from the firm’s research into the needs of different asph