Skip to main content

New bridge for old Russian city

Murom, one of Russia's best preserved old cities, is situated in the European part of the country, around 300km to the east of Moscow. The most important industry and economic activities are mechanical engineering along with timber and textiles. The location on the River Oka, a tributary of the Volga and thus an important waterway, as well as the good connections to important main roads and rail routes, are positive economic factors. It is near Murom that German formwork and scaffolding specialist PERI is p
July 30, 2012 Read time: 3 mins
Impressive: The cable-stay bridge over the River Oka features two 231m spans and is carried by three pylons with heights of around 90m. Photo: PERI
Murom, one of Russia's best preserved old cities, is situated in the European part of the country, around 300km to the east of Moscow.

The most important industry and economic activities are mechanical engineering along with timber and textiles.

The location on the River Oka, a tributary of the Volga and thus an important waterway, as well as the good connections to important main roads and rail routes, are positive economic factors.

It is near Murom that German formwork and scaffolding specialist 298 PERI is providing a complete range of services for the construction of the three 90m high bridge piers.

Positioned at distances of 231m from each other respectively, these have been designed to carry the loads of the cable-stay construction which will span the River Oka at a height of 30m. The bridge is scheduled to be opened in 2009.

Underneath the carriageway, the cross-sectional form and dimensions of the pylon legs are continuously changing and the pentagonal basis transforms into a rectangle at height of the carriageway slab. In addition, the resulting outside pylon edges exhibits a curvature with a 300mm radius. From the top edge of the carriageway upwards, the shape and dimensions in a lateral direction remain constant for the most part; in a longitudinal direction, however, the external dimensions of the pylon tapers from 6-3m.

For the 21 concreting sections in each case, with 3.67m standard cycle heights, PERI engineers designed customised climbing formwork solutions and, in so doing, relied on the flexibility of the PERI VARIO girder wall formwork. In connection with workflow-oriented execution planning, all required adjustments can be carried out on the variable cross-sections from cycle to cycle with a minimum of time and effort. Together with the PERI CB climbing scaffold system for the vertical and slightly inclined areas as well as SKS/SSC brackets of the PERI SKS single-sided, retractable climbing formwork for the forward and reversed-angled sections, fully adaptable climbing formwork units are formed. On each of the pylon legs, the four scaffold platforms along with the re-adjusted formwork for each concreting section is climbed by means of a single crane pick.

"As a cost-effective solution for non-standard and unusual architect demands as well as any kind of special designs, PERI also delivers pre-assembled 3D formwork units directly to the construction site," says the company.

"For the Murom bridge, these serve to accurately form the contours of the pier geometry at the bottom, and are attached to the inside of the VARIO formwork at the front." The customised individual units were produced in Weissenhorn at the company's 866 CNC timber processing plant but then shipped to Russia in the form of compact construction kits.

"Due to the precision-made formed components complete with insertion slits, the clear markings and an exact construction plan, joining was able to be carried out on site with only a minimum of effort." The contractor is 2450 Mostotrest of Moscow, and field service is by PERI Moscow and Weissenhorn.

For more information on companies in this article

Related Content

  • Liebherr’s new mixing plant generation
    October 11, 2022
    Liebherr is introducing a new mixing plant generation, with modular design being a key feature. The new generation plants will be available in Germany, Austria and Switzerland from 2023, and will then be made available for world markets.
  • Mozambique’ new bridge opens to traffic
    November 14, 2018
    Mozambique’s new suspension bridge connecting Maputo with Catembe is now open to traffic. The suspension bridge is the longest of its type in Africa, measuring almost 3km-long and surpassing the previous holder of this accolade, the Mapati Bridge in the Democratic Republic of Congo. The new bridge spans Maputo Bay and forms part of a new highway connection running from Mozambique’s capital, Maputo, all the way to the border with South Africa. The route will be of major benefit for Mozambique, helping to boo
  • Tees Valley crossing project consultation nears an end
    May 9, 2019
    Public consultation is nearly closed for a possible new crossing across the River Tees in northern England that could cost upwards of €350 million. A €230-290 million Tees Viaduct Capacity Enhancement project is the preferred option against a €350 million Tees Viaduct option, according to the recently created Tees Valley Combined Authority, the local government. Capacity Enhancement project would see a two-lane bridge built parallel to the existing A19 viaduct to carry traffic travelling northbound an
  • Wirtgen’s new recycling technology
    June 22, 2018
    Wirtgen is offering an array of new technologies for milling, recycling and stabilising applications. These are intended to boost accuracy, versatility and performance. A new milling drum assembly is offered that widens the range of applications that the Wirtgen W 150 CF/W 150 Cfi milling machines can handle. This redesigned assembly allows users to select an array of cutter drums, including a 1.8m-wide unit. According to the firm, the machines offer the highest power to weight ratio for their class, with d