Skip to main content

Modular water treatment solutions

Siltbuster has provided Costain with four modular treatment solutions, to be used during the delivery of the £200 million Preston Western Distributor Road, linking Preston and southern Fylde to the M55 motorway.
May 3, 2021 Read time: 2 mins
A modular system from Siltbuster is being used to protect water courses around the Preston Western Distributor Road project

The 4km dual carriageway is set to open in 2023 and includes a new motorway junction, four new bridges and three underpasses. The route goes past several surface watercourses, including the Savick Brook and the Lancaster Canal. With this in mind, Costain contacted Siltbuster and tasked it with planning the water runoff management.

Siltbuster has deployed four water treatment systems to cover the multiple controlled watercourses where water is being released from the site. Each location is regulated by the Environment Agency, with the Environmental Permit requiring total suspended solids to be less than 100mg/litre and a pH value between pH6 and pH9 to be achieved consistently.

In order to protect the north-west's aquatic ecosystems and habitats, each Siltbuster unit needed to be capable of treating flows of up to 40m3/hr. To deliver this, all of the systems include two-stage flow proportional chemical dosing of coagulant and flocculant to improve the settlement rates of the very fine suspended clay solids, and an 8m3 tank complete with mixers and a HB50 lamella clarifier. The modular nature of these solutions means additional capacity can easily be added should there be greater volumes of water needing to be treated.

Costain said that Siltbuster systems have helped keep the project on track by ensuring the contractor is in line with its environmental permit at all times, protecting the surrounding habitats. Because Siltbuster was consulted from an early stage in the project, the firm was able to advise on temporary flexible modular solutions that could be rapidly deployed from its hire fleet as soon as the need arose. The company has also offered Costain specialist technical advice and training, helping to protect the aquatic ecosystems around the project.

For more information on companies in this article

Related Content

  • IRF recommends action for greener roads
    July 4, 2012
    IRF's 2nd International Conference on Roads and Environment reveals how to make roads greener, cleaner and healthier, and follows through with action recommendations IRF's Conference in Geneva on 10-11 November, 2008 put three issues in sharp focus: innovative materials to save energy and other resources, inspiring solutions for water management; an integrated approach to noise and air pollution; and greenhouse gas (GHG) emissions monitoring, accounting and offsetting. Some 140 delegates from 36 countries l
  • EVENT: wildlife-vehicle collision reduction
    May 9, 2024
    A symposium this month in Sydney by the Australasian Network for Ecology and Transportation (ANET) and the Environment Institute of Australia and New Zealand (EIANZ) will explore how new and emerging technologies are helping reduce the millions of mammal deaths annually – an estimated four million in Australia alone.
  • Washington DC’s historic bridge replacement project
    June 11, 2019
    The project to replace a historic bridge in US capital Washington DC is providing major challenges for its builders - Mike Woof writes
  • Switzerland’s new tunnel bore being built
    April 19, 2018
    A major new road tunnel project is being constructed in Switzerland – Mike Woof writes Construction work is now underway in Switzerland for the new Belchen Tunnel bore, a project that has resulted from the country’s long-term infrastructure planning. The building of this latest tunnel is important for Switzerland economically as it will deliver an upgraded link for a major transport infrastructure connection. When it is complete, the tunnel will form part of the vital A2 route between Basel, in the north