Skip to main content

Cortec provides MCI 2020 protection for Croatia’s Krk Bridge

Krk Bridge is a 1.4km reinforced concrete arch bridge connecting the Croatian island of Krk to the mainland and carrying over a million vehicles per year. The longer of the bridge's two arches is the longest concrete arch in the world outside of China.
February 5, 2020 Read time: 2 mins
Cortec’s MCI 2020 surface protection system is being used in the Krk Bridge preservation project

Strong winds often cause the 1.4km structure to be closed. Also, the salt air has corroded the bridge that was opened in 1980; it requires constant maintenance to provide the next 36 years of its expected service. It costs around €1 million every year in regular and extra maintenance.

Cortec says that application of its MCI 2020 will stop further corrosion of reinforcing metals and will be used in a 30-year maintenance plan where field investigation of the current status and the preservation project design was done by IGH, Institute for Civil Engineering, based in the Croatian capital Zagreb. According to the results, the concrete is contaminated to the depth of the main reinforcement, so the existing concrete is removed to this depth.

After the removal of contaminated concrete layer the cleaned concrete surface is treated with MCI 2020 (Migrating Corrosion Inhibitor) - a surface-applied corrosion inhibitor designed to migrate through concrete structures and seek out the steel reinforcement bars in concrete. A feature of MCI 2020 is that if it is not in direct contact with metals, it will migrate a considerable distance through concrete to provide protection.

Detailed visual inspection of the concrete and reinforcement is carried out and any faults are eliminated by removal of the concrete and cleaning the rebar.  If corrosion is found then MCI 2020 is applied.

Before applying the mortar, the surface must be thoroughly moistened; any excess water must be removed. Repair mortar is then applied by spray onto the surface treated with the MC 2020 inhibitor in a single layer. This provides excellent adhesion, so no binding layer is required, according to Cortec.

Related Content

  • Tricky mountain road rebuild job in Phoenix AZ
    June 16, 2021
    North Mountain in Phoenix, Arizona is one of the metropolitan area’s most recognisable landmarks and busiest hiking destinations.
  • Big measuring from TinyMobileRobots
    February 27, 2017
    Small is beautiful, especially when it comes to robots, explains Jens Peder Kristensen, director of Danish company TinyMobileRobots With the increased functionality of outdoor robots, the market for autonomous robots as a replacement for human work has widened. The human touch is still needed when dealing with terrain that is difficult to navigate or with a crowded construction site.
  • Efficient road maintenance with Simex
    October 1, 2022

    Simex at Bauma Munich from 24 to 30 October, Hall C5, Booth 325.

    Bauma Munich – the most anticipated trade fair event in terms of strategic importance, turnout, new product launches and media impact for the earthmoving sector – has always been an opportunity for Simex to show to its partners and users its technical quality. The ability to innovate and do research, combining the new models in the range with new technological concepts, it’s the Simex way to outline the paths to be followed in the future.

  • German Autobahn receives new concrete surface
    September 11, 2014
    Precision paving performance has been achieved on a major road project in Germany, using Wirtgen slipform pavers. The SP1500 and SP1500L models have been used to help upgrade a stretch of the BAB A9 Autobahn in Thuringia. The BAB A9 Autobahn is one of Germany’s most important roads, connecting the German cities of Berlin and Munich over a total distance of 529km. The route runs from Brandenburg through Saxony-Anhalt, Saxony, Thuringia and into Bavaria.