Skip to main content

Breakers building underground carpark in Qatar

A fleet of Rammer breakers is being used to help build a new underground car park in Qatar The underground car park will be for a dentistry and dermatology clinic in the capital, Doha. Hydraulic hammers being mentioned at the same time as a dental surgery is often associated with pain, discomfort and general unpleasantness. This is not the case in Doha, the capital of Qatar, as Rammer hammers are being used to spearhead the creation of an underground car park at a dentistry and dermatology clinic.
June 20, 2016 Read time: 2 mins
The Rammer breakers are meeting productivity targets
A fleet of 5076 Rammer breakers is being used to help build a new underground car park in Qatar

The underground car park will be for a dentistry and dermatology clinic in the capital, Doha.

Hydraulic hammers being mentioned at the same time as a dental surgery is often associated with pain, discomfort and general unpleasantness. This is not the case in Doha, the capital of Qatar, as Rammer hammers are being used to spearhead the creation of an underground car park at a dentistry and dermatology clinic.

The principle contractor on the project, 5487 Roadbridge, is using a fleet of Rammer hammers that range from a pair of 3288 models right up to a 7013. The latter being the largest unit in the Rammer range. Part of a US$10 million contract, the project requires the removal of around 350,000m3 of medium and hard limestone to create a car park space that is 200m long by 150m wide and 25m deep.

The six-month contract is being carried out by Roadbridge. Heavy breaking is carried out by the 6.2tonne Rammer 7013 which is mounted on a Volvo EC700 excavator. The firm also has a 2300 Komatsu PC600 and a 178 Caterpillar 345, each carrying a 3.9tonne Rammer 5011.   

Elsewhere on the site, a pair of JCB JS360 excavators are being used for out-breaking work using two Rammer 4099 hammers, each of which weigh in at 2.8tonnes. Lighter breaking work is charged to two more JCB excavators, both JS260 units, that are each equipped with a 2.04tonne Rammer 3288 breaker.

Despite the high temperatures, dusty conditions and long 10-hour shifts, the Rammer units have been reliable and Roadbridge reckons it will meet its target of an average production rate of 3,000m3/day throughout the work.

For more information on companies in this article

Related Content

  • Sandvik renewed and buoyant in China
    November 30, 2018
    Just five months after becoming Sandvik Mobile Crushers & Screens’ Chinese market dealer, Pota Environment (Shanghai) has already sold 20 units - and is forecasting a strong sales year in 2019. Three jaw-cone-screener plant trains have been bought by Xindadi, a Beijing-based aggregates processing company, who are using the nine machines to process gneiss into 0-8mm and 8-28mm final products for highways and other infrastructure works’ customers in and around China’s capital. “The customer is able to p
  • New paving range
    February 8, 2012
    Several key additions to Dynapac's equipment line-up will extend the firm's machine range for the road construction market. Paving, planer and compaction lines will benefit from new machines, with president Claes Ahrengart emphasising the investment in research and development Dynapac continues to make.
  • New breaker from Atlas Copco
    March 7, 2012
    Three years ago Atlas Copco launched the first of the new generation of solid body breakers based on a new manufacturing method and new body design, and last year it sold more than 10,000 small breakers in the 50 to 550kg class. Atlas Copco SB breakers are used for road work, trenching, general demolition, plus primary and secondary rock breaking, and the company is now launching the mid-range model, the SB 302, for excavators of up to 9tonnes.
  • Giving credence for Clearwater revival
    October 29, 2018
    The Minnesota Highway 24 Bridge spanning the Mississippi River at Clearwater is not a major structure. However, it does play a key role as the 376.4m-long bridge links US Highway 10 and Interstate 94. These routes run parallel on opposite sides of the Mississippi River and connect St Cloud to Minneapolis. There was a need to replace the old bridge, built in the 1950s, as it has been designated functionally obsolete, while it featured a restricted maximum load of 36.3tonnes. The price tag to demolish and