Skip to main content

Brazilian bridge to the beach

The State of Pernambuco in north-eastern Brazil has some of the country's most beautiful beaches, and on the peninsula of Cabo de Santo Agostinho a luxury resort has sprung up with apartments (condominios) and hotels for international tourists. To give the resort a convenient, fast link to the coastal highway, the Via Parque consortium is building a bridge over the Jaboatão River, which separates the peninsula from the mainland.
March 1, 2012 Read time: 2 mins
An impression of how the bridge will look
The State of Pernambuco in north-eastern Brazil has some of the country's most beautiful beaches, and on the peninsula of Cabo de Santo Agostinho a luxury resort has sprung up with apartments (condominios) and hotels for international tourists.

To give the resort a convenient, fast link to the coastal highway, the Via Parque consortium is building a bridge over the Jaboatão River, which separates the peninsula from the mainland.

The 320m long Ponte do Paiva across the river has a clear span of 290m, and is part of a new road system that will cut the journey from the airport to the peninsula from 48km to 14km. It will have two traffic lanes and a pedestrian and cycle lane.

The reinforced concrete box girder is being constructed using the cantilever method, working outward from the two pier heads and back-stayed in every casting section. Via Parque opted for 203 Doka Brasil to supply the formwork, and it planned and supplied a custom formwork solution that was optimally tailored to the specific requirements.

The four cantilevered forming carriages were fitted with a total of 1,000m² of large-area formwork Top 50. The formwork solution called for particular flexibility in the seventh casting section, which at 5m in length is twice as long as a typical section. Using stacking plates and 1.8m long formwork beams, it was possible to lengthen the formwork to the desired dimensions swiftly and safely.

A Doka field service technician coordinated the job of erecting the formwork solution correctly, and was on hand to assist the site team with advice and practical help throughout the start-up phase.

Although the crane had not been erected, forming operations on the foundations of the pier heads had to be started, and Doka Brasil supplied the site with the lightweight, rugged framed formwork Frami. Its low weight means that it can be shifted by hand.

"Even without crane assistance, some very good forming times were achieved with it on the site. Thanks to the logically coordinated panel formats, the crew was able to form the foundations with a minimum of prior planning," said Doka.

The site crew also used Frami on the pier-head itself.

For more information on companies in this article

Related Content

  • Italian highway benefits from road recycling job
    October 3, 2014
    The latest equipment from Wirtgen has been used to recycle a stretch of Italy’s busy A4 Autostrada, one of the country’s most important highways. The Wirtgen machine was the first WR250 recycler/reclaimer to be delivered to Italy and was put to work on the A4 Turin-Trieste highway where it proved highly productive. The A4 Autostrada runs 522km from Turin to Trieste via Milan and Venice across northern Italy from west to east. The A4 is divided into five segments, the Turin-Milan, Milan-Brescia, Brescia-Pad
  • Blown away by Generac’s Dust Fighter DF 4500
    February 18, 2021
    The DF 4500 has a manual or electric tilting system to better direct the flow of nebulised water.
  • Transylvanian motorway breaks new ground in engineering
    July 11, 2012
    Normally in hilly ground, we would use the excavated soil from the cuttings to fill the valleys," says Bogdan Sgarcitu, External Affairs Manager of construction company Bechtel. "But on this stretch the clay-like soil cannot be compacted, so we've had to use many more piles than normal: in just three months we installed more than 500, some drilled as deep as 24m. We've also had to transport millions of tonnes of materials over some less-than-perfect infrastructure."
  • New machinery helps boost quarry production
    July 28, 2015
    A quarry in the US has managed to boost production by around 30%, thanks to the acquisition of new equipment. Replacing the old crusher at the Lafarge Pitt River Quarry has made a massive increase in production capacity, helped by improvements to the existing crushing circuit. ELRUS Aggregate Systems provided advice on optimizing throughput, with the facility further improved with the addition of a new CH660 cone crusher from Sandvik Construction.