Skip to main content

Zambian bridge replacement programme

A bridge replacement programme in Zambia is connecting communities.
By MJ Woof March 9, 2020 Read time: 2 mins
Training has been carried out by Acrow Bridge in Zambia for local personnel on the modular bridge nits - image © courtesy of Acrow Bridge

Zambia is benefiting from a programme to install bridges and connect rural communities. The country has bought over 130 modular steel bridges measuring from 12m in length to more than 100m-long from Acrow Bridge.

The bridges include single- and multi-span span structures of one- and two-lane widths. And Acrow Bridge is providing training to Zambian engineers, technicians and contractors in assembly, installation and maintenance of the bridges, which were recently delivered to Zambia’s Road Development Agency.

These bridges are being installed where such links are particularly critical and will contribute to the integration of remote rural communities into the broader domestic and regional economy.

Through its financed Comprehensive Bridge Development Program model, Acrow has worked on a number of large infrastructure development projects in Africa, including the supply of more than 150 bridges to the Government of Angola, 100 bridges to the Department of Feeder Roads in Ghana, and 44 bridges to the Government of Cameroon.
 
Acrow’s prefabricated steel bridges feature a modular design that allows for the easy customisation of each structure to meet specific site requirements. They can be erected in days or weeks by a local workforce and minimal heavy equipment is required, while offering a service life of 75 years or more. Fabricated in the US from high-strength, high-quality steel, the components are hot-dip zinc galvanised to protect against corrosion.
 

Related Content

  • On track with Kistler
    February 15, 2022
    How to survey and safeguard a sensitive load-bearing road above a section of railway line? This was the challenge facing Revotec, a Vienna-based bridge monitoring specialist. The solution was KiTraffic Statistics, the weigh-in-motion (WIM) system from Kistler.
  • India’s longest road tunnel continues apace with Atlas Copco support
    May 20, 2014
    The challenging construction of India’s largest road tunnel is part of a vital US$500 million project aiming to connect the isolated northern state of Jammu and Kashmir with the rest of the vast and highly populated country. Guy Woodford reports Travelling on National Highway 1A (NH 1A) in northern India should be the dictionary definition of ordeal. The single lane, narrow and winding road crosses some of the steepest, most treacherous terrain on the planet. The arduous route becomes especially difficult t
  • Steel for Loch Ba bridge
    February 6, 2012
    Allerton Steel, on behalf of R J McLeod, has fabricated the steelwork for a replacement bridge at Loch Ba on Rannoch Moor in the Highlands as part of its A82 upgrade scheme for Transport Scotland. R J McLeod is the civil contractor on the £2.2 million (E2.6 million) scheme which replaces the existing three-span reinforced concrete bridge.
  • Liebherr achieves record turnover in 2012
    April 10, 2013
    The Liebherr Group achieved its highest turnover in its history in 2012. Turnover climbed over than 9% to €9.1 billion, while the company invested a total of €840 million in its operations. The 2012 business year progressed well for the Liebherr Group. Although the reduced dynamism of the world economy had a noticeable effect on orders received in the final months of the year, this no longer influenced turnover significantly. The Group increased its total turnover in the past business year by more than €760