Skip to main content

Work to restart on key Algerian highway section

Work looks set to restart on a key section of Algeria’s East-West highway. The country's national highways agency, the ANA, has issued the Japanese group Cojaal with a second formal request to restart work on a 359km section of the highway. Cojaal, along with the Chinese firm Citic-CRCC had been contracted to build 900km of the highway, which links the west of the country with the east. The Chinese section of the highway has been completed (although it was delayed) but Cojaal has yet to finish its section o
June 18, 2014 Read time: 2 mins
Work looks set to restart on a key section of Algeria’s East-West highway. The country's national highways agency, the ANA, has issued the Japanese group Cojaal with a second formal request to restart work on a 359km section of the highway. Cojaal, along with the Chinese firm Citic-CRCC had been contracted to build 900km of the highway, which links the west of the country with the east. The Chinese section of the highway has been completed (although it was delayed) but Cojaal has yet to finish its section of the route. Both technical and financial issues have caused delays to Cojaal’s work. The highway has been beset by problems linked to expropriation of land as well as the need to reroute public utilities. There have also been claims of problems with the feasibility study.

Related Content

  • New chapter for bituminous slurry in Colombia
    January 11, 2019
    Colombia’s San Rafael road concessionaire is using its first VSB Macropaver 12B unit to maintain a road carrying heavy traffic volumes – Enrique Saez writes The use of bituminous slurry for road maintenance works in Colombia is taking a new step forward with the purchase of equipment from VSS Macropaver by road contractors in the country. Engineer Ezequiel Romero, manager of the concessionaire San Rafael, explained that the application of bituminous grout has delivered major benefits for the firm. The c
  • Nepal highway subsidence problem causing traffic disturbance
    March 11, 2017
    Subsidence on a key stretch of highway in Nepal is causing major traffic disturbance. The BP Highway, also known as the Banepa- Sindhuli- Bardibas Road, has suffered subsidence on the Nepalthok-Khurkot stretch. The collapsed section measures 27m long and is causing delays for drivers. This Highway is an important route as it connets Nepal’s capital Kathmandu with Eastern Terai. Vehicles have been diverted to an alternative route, although part of the roadway is still being used to carry traffic in one d
  • Bidders line up for Belo Horizonte road
    July 6, 2022
    The groups interested are reportedly Acciona, Sacyr, CRCC, Construcap and ECB.
  • Croatia’s Peljesac Bridge progressing
    June 11, 2020
    China Road and Bridge Corporation is working through the pandemic period.