Skip to main content

Vietnam tunnel project faces delays

The expansion work for the Hai Van 2 Tunnel project in Vietnam now looks to face delays. A dispute over land compensation by residents in the area is holding back progress. Around 38% of the work for the Hai Van Tunnel 2 project was supposed to have been finished by July 2018 but in fact, only 25% of the work has been carried out.
July 20, 2018 Read time: 1 min

The expansion work for the Hai Van 2 Tunnel project in Vietnam now looks to face delays. A dispute over land compensation by residents in the area is holding back progress. Around 38% of the work for the Hai Van Tunnel 2 project was supposed to have been finished by July 2018 but in fact, only 25% of the work has been carried out.

The upgrade work is required to increase capacity on Vietnam National Highway No1 as traffic volumes on the route are increasing. The 6.3km Hai Van Tunnel 2 will have twice the capacity and feature two lanes when the work is complete. The project also includes building new emergency rescue tunnels to connect Hain Van Tunnel 2 and Hai Van Tunnel 1. New approach roads are also being built to Hai Van Tunnel 2 as part of the project. The Hai Van Tunnel 2 was built in 2005, initially as an emergency access tunnel for Hai Van Tunnel 1.

Related Content

  • Højgaard and BESIX win Nordhavn Tunnel work
    September 16, 2022
    The €349.6 million Nordhavnstunnel contract in the capital Copenhagen was awarded by the Danish Road Directorate / Vejdirektoratet.
  • US$4 billion bridge and highway project
    June 14, 2024
    A US$4 billion bridge replacement and highway upgrade project is planned for the US.
  • Costa Rica highway project completed
    December 18, 2018
    Work is now complete on a US$33.7 million highway project in Costa Rica. The work was carried out by Eurofinsa and involved upgrading Route 35, including building four bridges and two interchanges, one of which featured two overpasses. The National Route 35 was widened two four lanes between Florencia and La Abundancia and three lanes between Quesada and La Abundancia. According to IBT, part of Eurofinsa, the upgraded road forms part of a new highway that connects the Interamerican North Route 1 to the r
  • Massey Tunnel project to be Design-Build-Finance-Operate-Maintain
    January 25, 2016
    The provincial British Columbia government in western Canada has chosen a Design-Build-Finance-Operate-Maintain (DBFOM) procurement model for the Vancouver region’s 10-lane bridge replacement for the ageing Massey Tunnel. The US$2.5 billion project includes a bridge and related Highway 99 improvements between Bridgeport Road in the adjacent city of Richmond and Highway 91 in the city of Delta. The 60-year-old tunnel now carries its limit of 80,000 vehicles a day and is often congested during rush hours.