Skip to main content

Vietnam expressway deal progressing

Plans for Vietnam’s North-South expressway are progressing, with work moving ahead for key portions of the route’s eastern spur. A feasibility study has been carried out for the 29km Nha Trang-Cam Lam stretch, which is planned as a PPP project and is expected to cost around US$225 million. Feasibility studies for a further five portions of the North-South expressway are being carried out and should be ready shortly, with three feasibility studies already having been accepted in May 2018. Construction work f
June 14, 2018 Read time: 1 min

Plans for Vietnam’s North-South expressway are progressing, with work moving ahead for key portions of the route’s eastern spur. A feasibility study has been carried out for the 29km Nha Trang-Cam Lam stretch, which is planned as a PPP project and is expected to cost around US$225 million. Feasibility studies for a further five portions of the North-South expressway are being carried out and should be ready shortly, with three feasibility studies already having been accepted in May 2018. Construction work for the expressway is expected to commence in 2020.

Related Content

  • Plans for Laos-Vietnam highway
    May 29, 2018
    Plans are being drawn up in Laos for the new highway connecting its capital Vientiane with Hanoi, the capital of neighbouring Vietnam. The project is expected to cost in excess of US$4.5 billion, with much of the Laos section of the route running parallel to the existing Road N0 13 South.
  • North Carolina expressway opening to traffic
    December 6, 2018
    The new Monroe Expressway in North Carolina is now opening for drivers, which will cut journey times for many drivers in the city of Charlotte.
  • Investing in East Africa's road sector to boost economic development
    April 14, 2020
    Investments in East Africa’s road sector are helping drive economic development as well as political stability
  • Vietnam sets highway plan of action
    May 28, 2012
    Additional funding is being sought for the third stage of a project that will upgrade the 3,010km Ho Chi Minh Highway in Vietnam. The third phase of the project has an estimated investment capital of some US$14.7 billion and foreign and local investors are being invited to invest in the road through different funding structures. The funding models will include the proven build-transfer-operate (BTO), build-transfer (BT) and build-operate-transfer (BOT) systems, with from 20%-30% of the funding to come from