Skip to main content

VIDEO footage shows bridge replacement project in Rhode Island

A time-lapse video has been released showing the rapid replacement of the Barton Corner Bridge in Rhode Island in the US. Rhode Island Department of Transportation (RIDOT) partnered with EarthCam to document the US$6.4 million rapid replacement of the Barton Corner Bridge. The construction project was completed during an 11-day period in August 2014 and can be seen in an exclusive time-lapse, released by RIDOT. Had RIDOT had used conventional methods, the bridge replacement would have taken two full constru
October 10, 2014 Read time: 2 mins
A time-lapse video has been released showing the rapid replacement of the Barton Corner Bridge in Rhode Island in the US. 3536 Rhode Island Department of Transportation (RIDOT) partnered with 7653 EarthCam to document the US$6.4 million rapid replacement of the Barton Corner Bridge. The construction project was completed during an 11-day period in August 2014 and can be seen in an exclusive time-lapse, released by RIDOT. Had RIDOT had used conventional methods, the bridge replacement would have taken two full construction seasons. By accelerating the construction process, the bridge was replaced in less than one month, saving money while eliminating traffic congestion.

The project was complex as the Barton Corner Bridge carries four lanes of I-95 plus two auxiliary lanes at a busy interchange with Route 2 on the Warwick/West Warwick line. Using accelerated bridge construction, RIDOOT built two halves of the bridge on land adjacent to the overpass, and then moved them into place. This enabled the new bridge to be constructed much faster compared with conventional construction methods, which would have taken twice the time. This approach also allowed RIDOT to do the work with no impact to Interstate traffic prior to installation.

EarthCam captured the innovative project from multiple angles by installing seven HD cameras in key locations.

Learn more about RIDOT and the Barton Corner Bridge replacement:

Time-Lapse: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.dot.ri.gov/news/barton_corner/video.php Visit http://www.dot.ri.gov/news/barton_corner/video.php false http://www.dot.ri.gov/news/barton_corner/video.php false false%>

Facebook: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.facebook.com/RIDOTNews Visit Facebook page false https://www.facebook.com/RIDOTNews false false%>

Twitter: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal twitter.com/RIDOTNews Visit Twitter page false https://twitter.com/RIDOTNews false false%>

YouTube: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.youtube.com/user/RIDOTwebmaster Visit RIDOT Youtube Page false https://www.youtube.com/user/RIDOTwebmaster false false%>

For more information on companies in this article

Related Content

  • Sandvik Mobile Crushers and Screens unveil two new models
    February 13, 2013
    Sandvik Construction Mobile Crushers and Screens is officially launching two new additions to its product offering, a new heavy-duty scalper and a new Impactor model. The latest incarnation of the original E7 mobile scalper is said to demonstrate the value of customer feedback and experience, as the new model contains a “wish list of features and benefits that far exceed traditional expectations of durability and technical excellence.” Customer requirements, said to have been met with the new model, include
  • Czech minister Tok warns Eurovia to speed up D1 bridge repairs
    January 8, 2015
    The Czech transport minister has given construction firm Eurovia until April to start repairs on two bridges it built or face having its bank guarantees withdrawn. Transport Minister Dan Tok, who until December was the chief executive of Skanska in the Czech Republic, said he would call for a new tender for the repairs if no action is taken by Eurovia, according to a report by the Czech internet news portal iDNES. Tok said that the road bridges constructed six years ago on the D1 motorway slip road in
  • Powerscreen to reveal new machine enhancements
    February 12, 2013
    Powerscreen is unveiling new product improvements in a line-up of three machines: the XA400S pre-screen jaw crusher; the XH320X impact crusher and the Warrior 1400X screen. “We are excited to be revealing the latest enhancements made to our product portfolio at bauma. This year’s exhibition will be the first showing of the new Warrior 1400X screen anywhere in the world and will provide visitors with an opportunity to look closer at the recently released XA400S pre-screen and XH320X crushers,” says Damian Po
  • PERI’s VARIOKIT as cantilever equipment takes to bauma stage
    January 6, 2017
    PERI’s VARIOKIT engineering construction kit, being showcased at bauma, is said by the German firm to have already provided cost-effective and flexible solutions for superstructures for several years. From project-specific solutions for tunnels, to system applications in bridge construction and heavy-duty towers for the highest loads, VARIOKIT is extremely adaptable. Now it can also be used for the balanced cantilever method with a few additional, newly developed system components. The new components for t