Skip to main content

VIDEO footage shows bridge replacement project in Rhode Island

A time-lapse video has been released showing the rapid replacement of the Barton Corner Bridge in Rhode Island in the US. Rhode Island Department of Transportation (RIDOT) partnered with EarthCam to document the US$6.4 million rapid replacement of the Barton Corner Bridge. The construction project was completed during an 11-day period in August 2014 and can be seen in an exclusive time-lapse, released by RIDOT. Had RIDOT had used conventional methods, the bridge replacement would have taken two full constru
October 10, 2014 Read time: 2 mins
A time-lapse video has been released showing the rapid replacement of the Barton Corner Bridge in Rhode Island in the US. 3536 Rhode Island Department of Transportation (RIDOT) partnered with 7653 EarthCam to document the US$6.4 million rapid replacement of the Barton Corner Bridge. The construction project was completed during an 11-day period in August 2014 and can be seen in an exclusive time-lapse, released by RIDOT. Had RIDOT had used conventional methods, the bridge replacement would have taken two full construction seasons. By accelerating the construction process, the bridge was replaced in less than one month, saving money while eliminating traffic congestion.

The project was complex as the Barton Corner Bridge carries four lanes of I-95 plus two auxiliary lanes at a busy interchange with Route 2 on the Warwick/West Warwick line. Using accelerated bridge construction, RIDOOT built two halves of the bridge on land adjacent to the overpass, and then moved them into place. This enabled the new bridge to be constructed much faster compared with conventional construction methods, which would have taken twice the time. This approach also allowed RIDOT to do the work with no impact to Interstate traffic prior to installation.

EarthCam captured the innovative project from multiple angles by installing seven HD cameras in key locations.

Learn more about RIDOT and the Barton Corner Bridge replacement:

Time-Lapse: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.dot.ri.gov/news/barton_corner/video.php Visit http://www.dot.ri.gov/news/barton_corner/video.php false http://www.dot.ri.gov/news/barton_corner/video.php false false%>

Facebook: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.facebook.com/RIDOTNews Visit Facebook page false https://www.facebook.com/RIDOTNews false false%>

Twitter: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal twitter.com/RIDOTNews Visit Twitter page false https://twitter.com/RIDOTNews false false%>

YouTube: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.youtube.com/user/RIDOTwebmaster Visit RIDOT Youtube Page false https://www.youtube.com/user/RIDOTwebmaster false false%>

For more information on companies in this article

Related Content

  • Nice in 2018: The Pavement Preservation & Recycling Summit (PPRS)
    November 17, 2017
    Siobhan McKelvey, president of the Paris-based International Bitumen Emulsion Federation (IBEF), explains the importance for attending next year’s Pavement Preservation & Recycling Summit. The event will be held in Nice in southern France from 26-28 March at the Nice Acropolis. One of the highlights for me that is provided by the PPRS platform is the opportunity to exchange on communication experiences throughout the world and how the challenges of promoting the role of a good road network are met.
  • Call for SME exhibitors at Road Infrastructure Innovation Expo, Brussels
    April 2, 2013
    SMEs developing innovative solutions to improve road infrastructure now have until 12 April, 2013, to apply to exhibit free-of-charge at the first Road Infrastructure Innovation Expo being held in Brussels, Belgium, 4-6 June 2013. Due to the involvement of additional countries and the final constitution of the scientific committee for the Infravation programme, organisers have extended the exhibitor registration deadline. All research fields are welcome addressing the theme of Advanced and Innovative Constr
  • Cummins launches SCR only Stage IV/Tier 4 engines
    January 6, 2017
    Cummins used bauma to reveal the QSF3.8 – a four-cylinder engine platform delivering a power range of 63-89kW – which is ready to meet Stage IV/Tier 4 Final emissions regulations. Using only SCR for its exhaust after-treatment process, the QSF3.8 avoids the need for either DOC or DPF as a result of using a high-efficiency catalyst to convert oxides of nitrogen at lower exhaust temperatures while requiring only low doses of DEF, said the company.
  • Cummins launches SCR only Stage IV/Tier 4 engines
    April 16, 2013
    Cummins used bauma to reveal the QSF3.8 – a four-cylinder engine platform delivering a power range of 63-89kW – which is ready to meet Stage IV/Tier 4 Final emissions regulations. Using only SCR for its exhaust after-treatment process, the QSF3.8 avoids the need for either DOC or DPF as a result of using a high-efficiency catalyst to convert oxides of nitrogen at lower exhaust temperatures while requiring only low doses of DEF, said the company.