Skip to main content

Venezuela bridge replacement project announced

Work to replace the Guanape Bridge in Venezuela is now commencing. The existing structure collapsed on the 24th January of this year, injuring eight people, but is too severely damaged to be rebuilt. The bridge was built in 2011 so its collapse has been the subject of some controversy. Building the new two lane structure will cost an estimated US$312 million and should be complete by the middle of 2017.
February 24, 2017 Read time: 1 min
Work to replace the Guanape Bridge in Venezuela is now commencing. The existing structure collapsed on the 24th January of this year, injuring eight people, but is too severely damaged to be rebuilt. The bridge was built in 2011 so its collapse has been the subject of some controversy. Building the new two lane structure will cost an estimated US$312 million and should be complete by the middle of 2017.

Related Content

  • Chicago’s expressway upgrade underway
    April 5, 2023
    Work is now underway on Chicago’s Kennedy Expressway upgrade project.
  • Cost increases for major Chilean highway project
    November 15, 2013
    The cost of Chile’s Vespucio Oriente highway project is increasing, while its completion also looks set to be delayed. A 13% budget increase is now required due to additional costs from a number of factors such as urban landscaping, according to Business News Americas. The Américo Vespucio Oriente (AVO) expressway is being built in Chilean capital Santiago and was originally expected to cost in the region of US$940 million. However Chile’s Public Works Ministry, MOP, has said that the route will now cost so
  • Bridge under construction collapses in Nepal
    February 28, 2012
    A bridge under construction linking Bhoteodar and Bharate in Nepal's Lamjung District has collapsed. The bridge is located in Western Nepal and spans the Marsyangdi River. Work on the truss type bridge commenced in February 2009 and the structure has a span of 65m and is 4m wide. At the time of the collapse, 25 construction workers were at the site and three are posted as missing while two were injured and were taken to hospital for treatment.
  • Croatia rejects complaints over Peljeski Bridge tender
    April 6, 2018
    Croatia’s public procurement body has rejected complaints by all three international consortia over a winning low tender for the Peljeski bridge. Bids for construction of the four-lane 2.4km bridge were submitted in the middle of last year. The bridge will connect Croatian territory by traversing the Adriatic Sea’s Mali Ston Bay. Vehicles must currently head from Croatia into Bosnia to re-enter a peninsula that is Croatian territory. Croatia’s State Commission for Control of Public Ordering Processes