Skip to main content

Upgrade set to start of Budapest’s Széchenyi Chain Bridge

Budapest’s iconic Széchenyi Chain Bridge that was opened in 1849 is set for a €73 million upgrade starting this summer, according to Hungarian media. Work will include revamping of a nearby tunnel in the Hungarian capital with completion set for the end of 2019. The suspension Chain Bridge spans the River Danube between Buda and Pest and was designed by English engineer William Tierney Clark following an initiative by the Count István Széchenyi. It is a larger scale version of Clark's earlier Marlow B
April 4, 2017 Read time: 2 mins
RSSBudapest’s iconic Széchenyi Chain Bridge that was opened in 1849 is set for a €73 million upgrade starting this summer, according to Hungarian media.

Work will include revamping of a nearby tunnel in the Hungarian capital with completion set for the end of 2019.

The suspension Chain Bridge spans the River Danube between Buda and Pest and was designed by English engineer William Tierney Clark following an initiative by the Count István Széchenyi. It is a larger scale version of Clark's earlier Marlow Bridge, across the River Thames in Marlow, near London. Its 202m centre span was one of the longest in the world when bridge was opened.

It was designed in sections and shipped from the United Kingdom for assemble in Budapest. The two-lane deck is nearly 15m wide and the iron chains on which the road-deck hangs are supported by two 48m river piers in classicist style. The bridge was rebuilt in the late 1940s after being blown up by the retreating German army in early 1945.

Related Content

  • Lower Thames Crossing contract – preferred bidder
    July 19, 2023

    The UK’s National Highways has announced that Skanska has been named the preferred bidder for the contract for the Lower Thames Crossing project.

  • Mecalac develops crawler rail-road excavator
    April 18, 2012
    Mecalac has introduced a rail-road version of its compact 8MCR crawler excavator. The machine has two sets of hydraulically-lowered rail wheels that use the dozer blade circuit to lift it clear of the tracks. The wheels can be set at 1,000mm, 1,435mm and 1,668mm widths, to suit various European rail networks. Activation of the on-rail function automatically turns on all regulatory lighting, limits the working height of the equipment, limits upper structure rotation and activates a load monitoring system.
  • Mecalac develops crawler rail-road excavator
    January 6, 2017
    Mecalac has introduced a rail-road version of its compact 8MCR crawler excavator. The machine has two sets of hydraulically-lowered rail wheels that use the dozer blade circuit to lift it clear of the tracks. The wheels can be set at 1,000mm, 1,435mm and 1,668mm widths, to suit various European rail networks. Activation of the on-rail function automatically turns on all regulatory lighting, limits the working height of the equipment, limits upper structure rotation and activates a load monitoring system.
  • Waterford bascule bridge delivery
    May 22, 2025
    Components for Waterford’s bascule bridge are being delivered.