Skip to main content

Upgrade set to start of Budapest’s Széchenyi Chain Bridge

Budapest’s iconic Széchenyi Chain Bridge that was opened in 1849 is set for a €73 million upgrade starting this summer, according to Hungarian media. Work will include revamping of a nearby tunnel in the Hungarian capital with completion set for the end of 2019. The suspension Chain Bridge spans the River Danube between Buda and Pest and was designed by English engineer William Tierney Clark following an initiative by the Count István Széchenyi. It is a larger scale version of Clark's earlier Marlow B
April 4, 2017 Read time: 2 mins
RSSBudapest’s iconic Széchenyi Chain Bridge that was opened in 1849 is set for a €73 million upgrade starting this summer, according to Hungarian media.

Work will include revamping of a nearby tunnel in the Hungarian capital with completion set for the end of 2019.

The suspension Chain Bridge spans the River Danube between Buda and Pest and was designed by English engineer William Tierney Clark following an initiative by the Count István Széchenyi. It is a larger scale version of Clark's earlier Marlow Bridge, across the River Thames in Marlow, near London. Its 202m centre span was one of the longest in the world when bridge was opened.

It was designed in sections and shipped from the United Kingdom for assemble in Budapest. The two-lane deck is nearly 15m wide and the iron chains on which the road-deck hangs are supported by two 48m river piers in classicist style. The bridge was rebuilt in the late 1940s after being blown up by the retreating German army in early 1945.

Related Content

  • Advances in road markings
    March 16, 2012
    Recent months have seen many major and vital road marking projects and products completed and tested in different parts of the world. Guy Woodford looks at some of them in Europe, North America, the Middle East and Africa. The London borough of Kensington and Chelsea now has one of the most dramatic streetscape designs in Europe. Exhibition Road’s striking chequered granite design, featuring a single surface running from South Kensington Station to Hyde Park and the full width of the road from building to b
  • First stay cable installed on UK’s Mersey Gateway bridge
    October 31, 2016
    The first stay cable, 52m long, connecting the Mersey Gateway south pylon to the main bridge deck, has been installed on the Mersey Gateway Project.
  • G&Z launching new concrete placer
    March 3, 2015
    New material placer being introduced by G&Z – Mike Woof writes. Guntert & Zimmerman is now lifting the wraps from its new MP550 material placer, having announced last year that design work was underway. This machine is designed to boost throughput and overall productivity on site, while being versatile, easy to maintain and service and offering low running costs. According to the firm, the MP550 is the most versatile material placer on the market as it can handle a wide variety of concrete slumps as well as
  • Bridge spanning Nepal’s Bagmati River open to traffic
    April 3, 2014
    The bridge linking Old Baneshwor and Sinamangal over the Bagmati River in Nepal’s capital Kathmandu has now been officially opened. This was carried out by the former minister for Physical Planning and Transport although the bridge itself had been open to traffic for five months prior to the inauguration. The old bridge had to be closed after one of the piers subsided in September 2009, a common problem for bridges in Nepal. The Nepalese Government has initiated the new bridge in January 2010. There have be