Skip to main content

Upgrade set to start of Budapest’s Széchenyi Chain Bridge

Budapest’s iconic Széchenyi Chain Bridge that was opened in 1849 is set for a €73 million upgrade starting this summer, according to Hungarian media. Work will include revamping of a nearby tunnel in the Hungarian capital with completion set for the end of 2019. The suspension Chain Bridge spans the River Danube between Buda and Pest and was designed by English engineer William Tierney Clark following an initiative by the Count István Széchenyi. It is a larger scale version of Clark's earlier Marlow B
April 4, 2017 Read time: 2 mins
RSSBudapest’s iconic Széchenyi Chain Bridge that was opened in 1849 is set for a €73 million upgrade starting this summer, according to Hungarian media.

Work will include revamping of a nearby tunnel in the Hungarian capital with completion set for the end of 2019.

The suspension Chain Bridge spans the River Danube between Buda and Pest and was designed by English engineer William Tierney Clark following an initiative by the Count István Széchenyi. It is a larger scale version of Clark's earlier Marlow Bridge, across the River Thames in Marlow, near London. Its 202m centre span was one of the longest in the world when bridge was opened.

It was designed in sections and shipped from the United Kingdom for assemble in Budapest. The two-lane deck is nearly 15m wide and the iron chains on which the road-deck hangs are supported by two 48m river piers in classicist style. The bridge was rebuilt in the late 1940s after being blown up by the retreating German army in early 1945.

Related Content

  • New Zealand link
    May 15, 2012
    A major milestone has been achieved in New Zealand on a major road project that is intended to deal with a major traffic bottleneck in the city of Auckland. The launching gantry team has now installed the last segment of the new northbound viaduct, a key stage in the Newmarket Viaduct Replacement project. There is currently a 1.5m gap between the segments. So, on Saturday 3rd and Sunday 4th December the two viaducts will be cemented together in an 18 hour procedure known as the Stitch. From then until the e
  • India Bogibeel Bridge project
    December 14, 2016
    Construction work is underway on India’s Bogibeel Bridge, which will span the Brahmaputra River. When complete the bridge is expected to come with a price tag of US$746.8 million. The new bridge will provide both road and rail links over the Brahmaputra River and is expected to open to traffic in March 2018. The novel design features an upper deck with three traffic lanes for road vehicles as well as a lower deck carrying twin rail lines. Measuring 4.9km long, the bridge will be the longest in India carryin
  • Traffic Data Systems introduces its WIM-DSP 32 system for use with Kistler Lineas sensors
    September 15, 2015
    Traffic Data System has introduced its WIM-DSP 32 system - digital signal processing – specifically for use with Kistler Lineas sensors and Kistler charge amplifiers. The design WIM-DSP 32 system has an integral colour graphics display and touch keys for easy configuration and functional control . WIM-DSP 32 enables a broad range of applications, from simple WIM systems for statistical purposes to sophisticated Weigh in Motion Enforcement -- WIM-E -- systems with monitoring and control of lane changes.
  • IRF announces 2012 GRAA Winners
    October 15, 2012
    Organisations behind the Rio de Janeiro's RJ122 project; the Kosovo Motorway project; and New York City's State-of-the-Art ITS Infrastructure Deployment Program were among the winners of the International Road Federation’s (IRF) 2012 Global Road Achievement Awards (GRAA) competition. This year's awards, whose winners were announced by IRF chairman and mayor of Riyadh, H.E Abdullah A. Al-Mogbel, honour nine projects from countries across the globe, each leading the way in innovation and excellence in its res