Skip to main content

Upgrade set to start of Budapest’s Széchenyi Chain Bridge

Budapest’s iconic Széchenyi Chain Bridge that was opened in 1849 is set for a €73 million upgrade starting this summer, according to Hungarian media. Work will include revamping of a nearby tunnel in the Hungarian capital with completion set for the end of 2019. The suspension Chain Bridge spans the River Danube between Buda and Pest and was designed by English engineer William Tierney Clark following an initiative by the Count István Széchenyi. It is a larger scale version of Clark's earlier Marlow B
April 4, 2017 Read time: 2 mins
RSSBudapest’s iconic Széchenyi Chain Bridge that was opened in 1849 is set for a €73 million upgrade starting this summer, according to Hungarian media.

Work will include revamping of a nearby tunnel in the Hungarian capital with completion set for the end of 2019.

The suspension Chain Bridge spans the River Danube between Buda and Pest and was designed by English engineer William Tierney Clark following an initiative by the Count István Széchenyi. It is a larger scale version of Clark's earlier Marlow Bridge, across the River Thames in Marlow, near London. Its 202m centre span was one of the longest in the world when bridge was opened.

It was designed in sections and shipped from the United Kingdom for assemble in Budapest. The two-lane deck is nearly 15m wide and the iron chains on which the road-deck hangs are supported by two 48m river piers in classicist style. The bridge was rebuilt in the late 1940s after being blown up by the retreating German army in early 1945.

Related Content

  • The power of water
    July 18, 2012
    The popularity of hydrodemolition is growing worldwide and was the specified solution for work on two vital Swedish links The hydrodemolition technique, which uses high pressure water jets to remove damaged concrete from various structures, is playing a crucial role in the major restoration of the vital Central Bridge and Söderled Tunnel in the centre of Sweden's capital Stockholm. The 1,550m dual two-lane rectangular box Söderled Tunnel and connecting dual two and three-lane Central Bridge are a vital 2.6k
  • Brazilian bridge being built
    March 23, 2015
    In Brazil the firm EcoRodovias has won the tender process for the Rio-Niteroi bridge contract. The Brazilian road management firm was awarded the tender for the Rio-Niteroi contract, with its proposed low charge for each user of the bridge. The company will take over management of the route from May 2015, for a period of 30 years. The tariff charged for light vehicles will immediately drop from the current US$1.61 (BRL 5.20) to $1.15 (BRL 3.70) when EcoRodovias takes over from CCR, which has the contract fo
  • Stuttgart’s Rosenstein Tunnel to open in March
    March 1, 2022
    Cost of the project, part of a larger interchange plan for the German city, is around €416 million.
  • Czech Republic re-tenders D4 Pribram and Pisek section as P3 deal
    January 6, 2017
    The Czech Transport Ministry has re-tendered for legal, technical and financial consultancy services regarding the first public-private partnership for a road project. The contract is for construction of a 32km section of the D4 motorway between Pribram and Pisek in South Bohemia. A previous tender for the €3.8 million project was cancelled by the Czech Anti-monopoly Office (UOHS) that suggested it contained flaws. Deadline for bids for the new tender is February 15 with construction of the remaini