Skip to main content

Upgrade set to start of Budapest’s Széchenyi Chain Bridge

Budapest’s iconic Széchenyi Chain Bridge that was opened in 1849 is set for a €73 million upgrade starting this summer, according to Hungarian media. Work will include revamping of a nearby tunnel in the Hungarian capital with completion set for the end of 2019. The suspension Chain Bridge spans the River Danube between Buda and Pest and was designed by English engineer William Tierney Clark following an initiative by the Count István Széchenyi. It is a larger scale version of Clark's earlier Marlow B
April 4, 2017 Read time: 2 mins
RSSBudapest’s iconic Széchenyi Chain Bridge that was opened in 1849 is set for a €73 million upgrade starting this summer, according to Hungarian media.

Work will include revamping of a nearby tunnel in the Hungarian capital with completion set for the end of 2019.

The suspension Chain Bridge spans the River Danube between Buda and Pest and was designed by English engineer William Tierney Clark following an initiative by the Count István Széchenyi. It is a larger scale version of Clark's earlier Marlow Bridge, across the River Thames in Marlow, near London. Its 202m centre span was one of the longest in the world when bridge was opened.

It was designed in sections and shipped from the United Kingdom for assemble in Budapest. The two-lane deck is nearly 15m wide and the iron chains on which the road-deck hangs are supported by two 48m river piers in classicist style. The bridge was rebuilt in the late 1940s after being blown up by the retreating German army in early 1945.

Related Content

  • VIDEO: London’s Silvertown Tunnel gets approval
    October 13, 2016
    A road tunnel costing €1 billion and a €111 million cycle and pedestrian bridge are among three infrastructure projects given the go-ahead by London’s mayor.

    The Silvertown Tunnel and the cycle and pedestrian bridge will link the Canary Wharf area north of the River Thames with Rotherhithe on the south bank.

    London mayor Sadiq Khan also approved an extension to the Docklands Light Railway that would run to Gallions Reach on the south bank of the Thames.
  • Progress on Serbia’s Zezeljev bridge replacement is slow
    August 30, 2017
    Construction of the Zezeljev rail and road bridge across the Danube River is facing further delays, according to the Serbian government. Work on the 470m-long new bridge was supposed to be finished by this month. But national elections and changes of government have hampered progress, Serbian media have reported. The original bridge was completed in 1961 as a single-track railway line and separate roadway between the cities of Novi Sad and Petrovaradin. NATO attacked the structure five times during its camp
  • Sava River bridge completed but not open
    August 16, 2022
    The bridge between Croatia and Bosnia will open when custom facilities are finished next year.
  • Financial close for Louisiana’s Calcasieu Bridge
    August 19, 2024
    Sacyr said that the project is the company’s first transportation infrastructure private-public partnership contract in the US and calls for a total of $2.27 billion in construction investment.