Skip to main content

UK report suggests 30km Pennine tunnel with robotic maintenance

The UK could build one of Europe’s longest road tunnels as it considers route options for a new major link connecting the cities of Manchester and Sheffield in England. An interim report looking at how best to connect the cities suggested that the road could be between 40km-50km, depending on the route. It “will include a tunnelled section, which could range from between 20-30km, making it one of the longest road tunnels ever built”.
December 2, 2015 Read time: 3 mins
The Pennines, coming soon to a tunnel near you

The UK could build one of Europe’s longest road tunnels as it considers route options for a new major link connecting the cities of Manchester and Sheffield in England.

An interim report looking at how best to connect the cities suggested that the road could be between 40km-50km, depending on the route. It “will include a tunnelled section, which could range from between 20-30km, making it one of the longest road tunnels ever built”.

The report also suggested robotic equipment be considered for routine inspections and maintenance tasks, such as tunnel cleaning and waste. “Robotic traffic management will also eliminate the dangers inherent in current systems of traffic management for large-scale maintenance schemes.”
 
Geology of the Pennines is generally suitable for construction of bored tunnels, said the report. “Our preliminary analysis suggests that the cross section through the tunnel will be dual carriageway and we need to have a minimum of two lanes in each direction.” But “the diameter of tunnel bores would be limited to around 15m using present-day tunnel boring machines”.
 
Tunnel design could be effected by the shift from oil-derived combustion to electric, hydrogen and other fuel sources that could reduce the need for ventilation shafts to remove exhaust fumes. The tunnel would need to incorporate low-maintenance systems and products to minimise the frequency of operations and to eliminate unnecessary or hazardous activities.

Even so, it is early days yet for detailed design considerations, according to the Trans-Pennine Tunnel Study Interim Report, published by a Mouchel-Hyder joint venture.
 
In July, 8100 Highways England awarded a €1.85 million contract to Mouchel and Hyder to complete a study for the route which is part of the government’s €21 billion long-term Roads Investment Strategy announced in December last year.

The report is investigating the strategic and economic case for a new high-standard highway route between Manchester and Sheffield, including assessing the potential opportunities of combining with a rail or light rail link. It is anticipated that the new route will cross the Pennines and the Peak District National Park, an extremely environmentally sensitive area.

“We are at too early a stage in the design of the potential scheme to present robust analysis on any of the economic costs and benefits of a scheme,” the report noted. Potential significant benefits include reductions in travel time of up to 30 minutes for both passenger and freight traffic between Manchester and Sheffield.

The current journey between Manchester and Sheffield over Pennine routes is around 72km and takes an average of 85 minutes. The same journey is 120km by the M62 motorway and takes 95 minutes.

Reduced travel over the Pennines could have positive impacts on the environment, according to the study.

“The means by which this new strategic route will be funded have not yet been considered. One option might be to introduce road-user tolls, but this would have an impact on the economic case for the scheme. The effects of tolling will be considered in later stages of the study, although a decision on whether or not to toll the road is outside the scope of the current study.”

Mouchel-Hyder said a final report would be published by October 2016.
 
The interim report is available by %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal clicking here Pennine Tunnel false http://www.gov.uk/government/uploads/system/uploads/attachment_data/file/480668/trans-pennine-tunnel-interim-report.pdf false false%>.

For more information on companies in this article

Related Content

  • INTERMAT launch for Ammann compaction measurement
    April 13, 2012
    Ammann has introduced the ACEeco compaction measuring system for its five model AVH hydraulic plate range. As an extra cost option, the system uses a compaction display that indicates the compaction progress using an LED scale. The system also displays the maximum compaction level achievable and this, said Ammann, will help operators to avoid making unnecessary passes and over-compaction. Available for AVH5020, 5030, 6020, 6030 and 100-20 models, which have operating weights from 530–555kg and working width
  • More electric charging stations for Ireland and Northern Ireland?
    December 13, 2012
    A new network of fast-charging stations for electric vehicles is planned for in Ireland and Northern Ireland. EU co-financing is providing over €2 million from its TEN-T Programme to research a comprehensive network of fast charging infrastructure for electric vehicles (EVs) in Ireland and Northern Ireland. The study will have far wider implications too than Ireland and Northern Ireland as it will provide important data policymakers can use when making decisions on the nationwide roll outs of EV infrastruct
  • Road engineering conference for Malaysia
    August 22, 2012
    The joint organisers of the Road Engineering Association of Asia & Australasia (REAAA) Conference, which will be held in Kuala Lumpur, Malaysia, from 26 to 28 March 2013, have announced that registration is now open on the event website - www.14reaaaconf2013.com. The theme of the event is The Road Factor in Economic Transformation, the focus of which will be on the development and maintenance of an efficient road infrastructure to meet the demands for sustainable economic growth in developing countries.
  • On-highway regulations point to Scania off-highway emissions solution
    January 6, 2017
    Scania will be showing both Euro 6 engines for its on-highway truck range and Stage IIB/Tier 4 Final powerplants for off-highway use. The company will use both exhaust gas recirculation (EGR) and selective catalytic reduction (SCR) to meet the coming regulations, as with its current Stage IIIB solution. This means the fitting of a diesel oxidation catalyst (DOC) but no requirement for a DPF. Scania engines are currently in use in Terex and Doosan articulated haulers, along with a number of Terex crushing ma