Skip to main content

Turner & Townsend picks up services deal for Stonehenge in the UK

Professional services company Turner & Townsend has been appointed to provide commercial services for two major Highways England programmes, including its flagship A303 Stonehenge scheme. The A303 upgrade includes plans to build a road tunnel near Stonehenge, a prehistoric monument in western England believed to have been built around 3,100 BC. The road project is part of a series of planned upgrades to A303/A358 corridor to improve connectivity between the south east and south west of England. The
April 6, 2018 Read time: 2 mins
Unhinged around Stonehenge: Cars congested on England’s A303

Professional services company 8731 Turner & Townsend has been appointed to provide commercial services for two major Highways England programmes, including its flagship A303 Stonehenge scheme.
 
The A303 upgrade includes plans to build a road tunnel near Stonehenge, a prehistoric monument in western England believed to have been built around 3,100 BC. The road project is part of a series of planned upgrades to A303/A358 corridor to improve connectivity between the south east and south west of England.
 
The three-year contract will see Turner & Townsend provide commercial services including estimating, benchmarking performance, commercial reporting and cost management in the period leading up to construction.  The project is undergoing consultation for a preferred route.
 
The consultant has also been appointed to deliver the next phase of two Highways England smart motorway upgrades. Turner &Townsend is providing commercial and programme management for improvements to the M6 between junctions 21a and 26 and M62 between junctions 10 and 12. 
 
Smart motorways increase capacity and reduce congestion by making the hard shoulder available as a traffic lane and by using variable speed limits to smooth traffic flow, supporting economic growth. Work includes an extensive upgrade to the drainage system as well as new emergency areas between junctions. There will be a new ducting system for power and fibre cables and work to overhead signs to provide electronic signs for CCTV and driver information systems.

For more information on companies in this article

Related Content

  • Importance of road/tunnel drainage systems
    May 8, 2012
    A variety of systems are available for quickly and efficiently removing water from roads as Patrick Smith reports. The presence of water in a highway layer reduces the bearing capacity of the road, and in doing so it also reduces the structure's lifetime. Indeed, the recent extremely cold winter in many parts of Europe has shown that in colder climates there is a risk of frost damage when water is present resulting in costly potholes, so drainage systems performing properly are important in road design.
  • Appointment made for key London Gateway link works
    November 27, 2012
    J. Murphy & Sons Ltd has been appointed by DP World to deliver junction improvement works on the A13/A1014 interchange road - a critical link into the London Gateway site in south east England. The London Gateway project near Stanford-le-Hope in Essex will comprise a deep water container port, Europe’s largest Logistics Park and a new access road linking the park to The Manorway (A1014) at Sorrel’s Roundabout.
  • Pearl Harbor Memorial Bridge, an extradosed design, opens in Connecticut
    September 30, 2015
    The first extradosed designed bridge in the United States, the Pearl Harbor Memorial Bridge in New Haven, Connecticut, was opened to traffic on September 28.
  • IRF announces the winners of its 2019 Global Road Achievement Awards
    February 13, 2020
    IRF has announced the winners of the 2019 IRF Global Road Achievement Awards, a global competition to recognise outstanding achievement by road professionals.