Skip to main content

Turkish tunnel project on schedule for completion

Work is progressing to plan for the construction of a new tunnel in Turkey. The new Ilgaz Mountain Tunnel should be completed by the end of 2015. This new link will help cut journey times for drivers. The construction of the Ilgaz Mountain Tunnel will reduce the travel distance along the existing route by some 5.4km. Construction work on the tunnel commenced in 2012 and the link will be one of the longest in Turkey when it is complete.
March 5, 2015 Read time: 1 min
Work is progressing to plan for the construction of a new tunnel in Turkey. The new Ilgaz Mountain Tunnel should be completed by the end of 2015. This new link will help cut journey times for drivers. The construction of the Ilgaz Mountain Tunnel will reduce the travel distance along the existing route by some 5.4km. Construction work on the tunnel commenced in 2012 and the link will be one of the longest in Turkey when it is complete.

Related Content

  • Grand achievement for Intermountain
    July 18, 2012
    A versatile solution has helped with a tricky project at the Grand Canyon in the US – Pierre Peltier When Intermountain Slurry Seal, a division of Granite Construction, submitted its bid in 2009 to repair roads and parking lots along the Grand Canyon’s North Rim, the company knew the job would come with challenges. The remote roads leading from Jacob’s Lake, Arizona, to the North Rim Lodge had deteriorated to a point that the Federal Highway Association’s (FHWA) Central Federal Lands (CFL) Highway Division
  • Road and bridge upgrades improving transport in Nepal
    November 1, 2019
    New road and bridge upgrades are being introduced in Nepal that will help improve transport and develop the country’s economy.
  • Construction commencing for Mersey gateway project
    September 15, 2014
    Work is now starting on the road links that will connect to the new Mersey Gateway Bridge, close to the UK city of Liverpool. The first work is being carried out at Junction 12 of the M56 in Runcorn, with workers commencing site clearance at the roundabout where the motorway joins the Weston Point Expressway (A557). This will take around six months to complete, with much of the work being carried out during off-peak traffic times so as to minimise congestion and this portion of the project should be finishe
  • Chinese firm for Cameroon highway contract
    February 8, 2024
    A Chinese firm will carry out a key Cameroon highway contract.