Skip to main content

Turkey’s Bosporus bridge opening

Turkey’s Yavuz Sultan Selim Bridge over the Bosporus is having its official opening, which is being carried out by senior members of the country’s government including president Recep Erdoğan. The final sections of the deck structure were put into place in March 2016 and the project, which commenced in 2013, has been completed in record time. This is the third bridge to span the Bosporus at Turkey’s commercial centre, Istanbul and the new crossing will form part of the country’s North Marmara Highway pro
August 25, 2016 Read time: 3 mins
Turkey’s Yavuz Sultan Selim Bridge over the Bosporus is having its official opening, which is being carried out by senior members of the country’s government including president Recep Erdoğan. The final sections of the deck structure were put into place in March 2016 and the project, which commenced in 2013, has been completed in record time.

This is the third bridge to span the Bosporus at Turkey’s commercial centre, Istanbul and the new crossing will form part of the country’s North Marmara Highway project. The project was carried out by the IC Ictas – 1324 Astaldi joint venture, which has handled the work under the build-operate-transfer (BOT) model. The consortium will operate the link for 10 years, two months and 20 days (which includes the construction period) before transferring it to Turkey’s Ministry of Transportation. The project team combined Turks from local firm ICTAS and Italians from contractors Astaldi, with designers from Belgium, France and Switzerland and a South Korean sub-contractor.

The bridge is of note as it carries eight highway lanes as well as two railway lines. Its 59m wide deck means that it is one of the largest suspension bridges ever constructed. Although not the world’s longest suspension bridge as such, it is the longest that carries both road and rail connections. The bridge is also of note technically in that it has been designed to cope with the massive earthquake shocks that occur periodically in the area.

The opening of the new bridge will help reduce congestion and journey times on the two existing crossings. It will also help to alleviate the notorious levels of traffic congestion in Istanbul, which often backs up on the feeder routes to the existing bridges.

The bridge has 322m high towers and the project cost some US$3 million. Other sections of the North Marmara Highway are already open to traffic and the entire route should be complete during 2018.

The project to construct the Yavuz Sultan Selim Bridge was the subject of a Key Project Report in World Highways in the %$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 18017 0 oLinkInternal June 2014 issue Major Europe-Asia bridge connection in Turkey false /sections/key-projects/features/major-europe-asia-bridge-connection-in-turkey/ false false%>.

The first bridge over the Bosporus was completed in 1973 and within one year of its opening, traffic volumes over the structure had grown by around 200% according to research.

The Fatih Sultan Mehmet Bridge (2nd Bridge) opened to traffic in 1988 and since that time, studies show that the volume of vehicles crossing the two bridges has increased enormously by as much as 1,180%. With traffic levels in Istanbul continuing to grow, along with the city’s population, the need for a third crossing has long been recognised and this was initially proposed in the 1990s.

For more information on companies in this article

Related Content

  • Melbourne link: Hyder and Parsons Brinckerhoff to be design team
    October 22, 2014
    Hyder and Parsons Brinckerhoff have been appointed as the design team for the US$5.97 billion East West Link in Melbourne, Australia. The two engineering and management consultancies are in a 50/50 joint venture to provide detailed design and construction support services for the 6.6km Stage 1 work, which is the eastern section, of the project. Together with the proposed western section, the completed East West Link will cost around $7 billion. The toll road will form an 18km cross-city connection ext
  • Turkish connection
    February 10, 2012
    The tender process is being opened for a new bridge across the Bosporus in Turkey. Turkey's Ministry of Transport is running the tender for the project.
  • England’s A14 project River Great Ouse Viaduct completed
    February 28, 2019
    Construction of the biggest bridge in Highways England’s €1.73 billion A14 Cambridge-to-Huntingdon upgrade has been completed. The River Great Ouse Viaduct stretches for 0.8km and when opened to traffic next year will take the new A14 road over the floodplain and the East Coast Mainline Railway line. Work began in November 2016 on the bridge that is part of a new 27.4km bypass under construction to the south of Huntingdon and away from the existing A14. The road is being widened to three lanes in both
  • New Turkey tunnels for Istanbul and Izmir
    May 31, 2017
    New tunnel connections are to be built in Istanbul and Izmir, along with a new bridge in Izmir. Work is due to start shortly on the Grand Istanbul Tunnel Project. This will be a three level tunnel and should help lower congestion in Istanbul, which suffers amongst the worst traffic jams of any city in the world.