Skip to main content

Turkey’s Bosporus bridge opening

Turkey’s Yavuz Sultan Selim Bridge over the Bosporus is having its official opening, which is being carried out by senior members of the country’s government including president Recep Erdoğan. The final sections of the deck structure were put into place in March 2016 and the project, which commenced in 2013, has been completed in record time. This is the third bridge to span the Bosporus at Turkey’s commercial centre, Istanbul and the new crossing will form part of the country’s North Marmara Highway pro
August 25, 2016 Read time: 3 mins
Turkey’s Yavuz Sultan Selim Bridge over the Bosporus is having its official opening, which is being carried out by senior members of the country’s government including president Recep Erdoğan. The final sections of the deck structure were put into place in March 2016 and the project, which commenced in 2013, has been completed in record time.

This is the third bridge to span the Bosporus at Turkey’s commercial centre, Istanbul and the new crossing will form part of the country’s North Marmara Highway project. The project was carried out by the IC Ictas – 1324 Astaldi joint venture, which has handled the work under the build-operate-transfer (BOT) model. The consortium will operate the link for 10 years, two months and 20 days (which includes the construction period) before transferring it to Turkey’s Ministry of Transportation. The project team combined Turks from local firm ICTAS and Italians from contractors Astaldi, with designers from Belgium, France and Switzerland and a South Korean sub-contractor.

The bridge is of note as it carries eight highway lanes as well as two railway lines. Its 59m wide deck means that it is one of the largest suspension bridges ever constructed. Although not the world’s longest suspension bridge as such, it is the longest that carries both road and rail connections. The bridge is also of note technically in that it has been designed to cope with the massive earthquake shocks that occur periodically in the area.

The opening of the new bridge will help reduce congestion and journey times on the two existing crossings. It will also help to alleviate the notorious levels of traffic congestion in Istanbul, which often backs up on the feeder routes to the existing bridges.

The bridge has 322m high towers and the project cost some US$3 million. Other sections of the North Marmara Highway are already open to traffic and the entire route should be complete during 2018.

The project to construct the Yavuz Sultan Selim Bridge was the subject of a Key Project Report in World Highways in the %$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 18017 0 oLinkInternal June 2014 issue Major Europe-Asia bridge connection in Turkey false /sections/key-projects/features/major-europe-asia-bridge-connection-in-turkey/ false false%>.

The first bridge over the Bosporus was completed in 1973 and within one year of its opening, traffic volumes over the structure had grown by around 200% according to research.

The Fatih Sultan Mehmet Bridge (2nd Bridge) opened to traffic in 1988 and since that time, studies show that the volume of vehicles crossing the two bridges has increased enormously by as much as 1,180%. With traffic levels in Istanbul continuing to grow, along with the city’s population, the need for a third crossing has long been recognised and this was initially proposed in the 1990s.

For more information on companies in this article

Related Content

  • Cost rises again for Columbia’s unfinished La Linea tunnel
    February 3, 2015
    Columbia’s transport minister has said it will take nearly US$168 million and more than two years to finish the controversial La Linea tunnel. Natalia Abello Vives said the government has a “plan B” to finish the 8.65km tunnel, which, as World Highways reported in May, has less than a kilometre remaining to be constructed. It was originally scheduled to be open by last November. The La Linea tunnel project, or Segundo Centenario tunnel, crosses the central mountain range and forms part of the Bogota-B
  • Bechtel and Enka win highway contract for Kosovo
    July 2, 2014
    Bechtel and its joint-venture partner Enka have won a contract to build a 60km highway connecting Kosovo’s capital Pristina with neighbouring Macedonia. The new Route 6 highway will help improve Kosovo’s transport links, a highly important factor for the future economic development of this small, landlocked nation. Bechtel-Enka previously constructed Kosovo’s Route 7 highway, which was completed in November 2013, a whole year ahead of schedule. The Route 7 highway with Morina on the Albanian border through
  • The world’s longest suspension bridge
    June 24, 2024
    The world’s longest suspension bridge is the 1915 Çanakkale Bridge in Turkey. This engineering marvel links Gelibolu with Lapseki, forming a key section of the 101km highway linking Malkara with Çanakkale. *Article produced in partnership with the General Directorate of Highways (KGM), Ministry of Transport and Infrastructure, Republic of Türkiye.
  • Brazil: contractors fear more layoffs as DNIT fails to pay up
    November 25, 2014
    The head of Brazil’s association of road constructors has warned of more layoffs unless the National Department of Infrastructure and Transport (DNIT) starts paying its contractors. Jose Alberto Pereira Ribeiro, president of ANEOR – National Association of Road Works - said companies already have been forced to lay off around 1,700 workers in light of non-payment by the government. Another 950 employees are on forced holidays. Ribeiro claimed DNIT failed to meet its financial obligations for September