Skip to main content

Toronto road rebuild project awarded

Work is starting shortly on rebuilding a stretch of Toronto’s FG Gardiner Expressway. The US$248 million project to upgrade section 1 of the route will be handled by the Aecon Group. Work will start in the third quarter of 2018 and should be finished by the end of 2020. Aecon Group’s contract calls for rebuilding work to three ramps plus a complete replacement of the FG Gardiner Expressway between Jarvis Street and Cherry Street. Other features of the work will include new street lighting systems being inst
July 16, 2018 Read time: 1 min

 Work is starting shortly on rebuilding a stretch of Toronto’s FG Gardiner Expressway. The US$248 million project to upgrade section 1 of the route will be handled by the 8786 Aecon Group. Work will start in the third quarter of 2018 and should be finished by the end of 2020. Aecon Group’s contract calls for rebuilding work to three ramps plus a complete replacement of the FG Gardiner Expressway between Jarvis Street and Cherry Street. Other features of the work will include new street lighting systems being installed along with a new communications system for emergency services.

For more information on companies in this article

Related Content

  • Integrated corridor management offers transportation efficiency
    May 28, 2013
    In the Intelligent Transportation Systems world, the concept of managing roadway or transportation corridors is not new. Smart Corridor concepts have existed for some time, such as the Santa Monica Smart Corridor system from the 1990s. Across the world, a new emerging model for operating roadway transportation networks called integrated corridor management (ICM) has emerged. This is particularly true in California, where several new ICM projects have or are being deployed. There is a new paradigm for corrid
  • Two more construction tenders for Slovakia’s R2 by end of 2018
    November 7, 2018
    Arpad Ersek, Slovakia's Minister of Transport, said another two tenders for construction of two R2 expressway stretches will be called by the end of 2018. They will include the stretch Roznava-Jablonov nad Turnou with the Soroska tunnel and the Kosice, Saca-Kosicke Olsany. In both cases financing has been secured. They could be financed through a loan or through the PPP scheme (public-private partnership). Ersek added that the ministry should receive an additional funds of up to €200 million through r
  • A wheely great bridge for the English city of Hull
    November 6, 2019
    A 60m pre-constructed pedestrian bridge weighing 150 tonnes as been wheeled into position over the A63 in the northern English city of Hull. The covered and vaulted Princess Quays Bridge will be renamed when it opens in the spring enabling pedestrians and cyclists to cross over the busy dual carriageway. The positioning operation meant that first the route was cleared of signage, guardrails and street lights. The bridge was then lowered onto two wheeled transporters – one at each end of the structur
  • Work underway for Ghana highway project
    July 1, 2022
    Work is underway in Ghana for a new highway project.