Skip to main content

Three bridges to be replaced in Nuremburg

In the southern German city of Nuremburg plans are being made for work to replace three old concrete bridges. A feasibility study into the proposed work will now be carried out. The three pre-stressed concrete bridges will have to be demolished and replaced with new structures. In all, the work is expected to cost some €100 million.
July 22, 2014 Read time: 1 min

In the southern German city of Nuremburg plans are being made for work to replace three old concrete bridges. A feasibility study into the proposed work will now be carried out. The three pre-stressed concrete bridges will have to be demolished and replaced with new structures. In all, the work is expected to cost some €100 million.

Related Content

  • Key projects free up Auckland's congested motorway network
    June 14, 2012
    A number of key projects in Auckland, New Zealand will free-up the city’s congested motorway network - Mary Searle reports.Auckland is a sprawling city, home to 1.4 million people, one third of New Zealand’s total population. Until recently, greater Auckland comprised Auckland city, North Shore city over the harbour bridge to the north, Waitakere city to the west and Manukau city to the south. An amalgamation of these various cities’ councils, plus the regional council and three district councils into one,
  • Kentucky-Indiana bridge project
    April 19, 2023
    Progress is being seen with the Kentucky-Indiana bridge project.
  • Winning formula for formwork
    July 19, 2012
    An unusual application of formwork took place recently in France, while formwork using one particular engineering construction kit was used for the first time in Poland. Guy Woodford reports An 80m long wild game underpass is an innovative feature of the Route Nationale 88 (RN 88) expansion in south-west France. For construction of the arched underpass tunnel, a PERI tunnel formwork carriage using VARIOKIT engineering construction kit was used. Thanks to the equipment’s easy handling, along with pre-assembl
  • Chile bridge design unveiled
    June 27, 2016
    The final design of Chile’s Chacao Bridge has now been revealed. This project is expected to cost in the order of US$700 million. The initial design was unveiled in 2015 but was then subject to a number of modifications to better meet requirements. South Korean company Hyundai is playing a central role in the consortium that will build the project although its partners for the work have yet to be finalised. Plans to build a bridge connecting Chiloe Island to the Chilean mainland have been discussed for some